J. Lohr, M. Blank, P. Borchard, S. Cauffman, M. Cengher, J. Doane, R. Ellis, K. Felch, Y. Gorelov, C. Moeller, S. Noraky, D. Ponce, A. Richenderfer, M. Shapiro
{"title":"DIII-D托卡马克上回旋管复合体的传输线性能和计划","authors":"J. Lohr, M. Blank, P. Borchard, S. Cauffman, M. Cengher, J. Doane, R. Ellis, K. Felch, Y. Gorelov, C. Moeller, S. Noraky, D. Ponce, A. Richenderfer, M. Shapiro","doi":"10.1109/IRMMW-THZ.2011.6104797","DOIUrl":null,"url":null,"abstract":"A major upgrade to the electron cyclotron heating complex on the DIII-D tokamak is underway. Two depressed collector gyrotrons are being added to the complex and the transmission lines are being upgraded. Transmission line efficiencies are being increased by reduction in the number of miter bends together with improved alignment resulting in improved mode purity.","PeriodicalId":6353,"journal":{"name":"2011 International Conference on Infrared, Millimeter, and Terahertz Waves","volume":"7 1","pages":"1-3"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Transmission line performance and plans for the gyrotron complex on the DIII-D tokamak\",\"authors\":\"J. Lohr, M. Blank, P. Borchard, S. Cauffman, M. Cengher, J. Doane, R. Ellis, K. Felch, Y. Gorelov, C. Moeller, S. Noraky, D. Ponce, A. Richenderfer, M. Shapiro\",\"doi\":\"10.1109/IRMMW-THZ.2011.6104797\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A major upgrade to the electron cyclotron heating complex on the DIII-D tokamak is underway. Two depressed collector gyrotrons are being added to the complex and the transmission lines are being upgraded. Transmission line efficiencies are being increased by reduction in the number of miter bends together with improved alignment resulting in improved mode purity.\",\"PeriodicalId\":6353,\"journal\":{\"name\":\"2011 International Conference on Infrared, Millimeter, and Terahertz Waves\",\"volume\":\"7 1\",\"pages\":\"1-3\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 International Conference on Infrared, Millimeter, and Terahertz Waves\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IRMMW-THZ.2011.6104797\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference on Infrared, Millimeter, and Terahertz Waves","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IRMMW-THZ.2011.6104797","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Transmission line performance and plans for the gyrotron complex on the DIII-D tokamak
A major upgrade to the electron cyclotron heating complex on the DIII-D tokamak is underway. Two depressed collector gyrotrons are being added to the complex and the transmission lines are being upgraded. Transmission line efficiencies are being increased by reduction in the number of miter bends together with improved alignment resulting in improved mode purity.