分析和模拟电压连接系统150 KV - PLTMG KASTELA 30兆瓦

Q4 Mathematics
Mochammad Apriyadi Hadi Sirad
{"title":"分析和模拟电压连接系统150 KV - PLTMG KASTELA 30兆瓦","authors":"Mochammad Apriyadi Hadi Sirad","doi":"10.33387/josae.v5i1.4878","DOIUrl":null,"url":null,"abstract":"Berdasarkan hasil simulasi dapat disimpulkan bahwa tegangan dip yang muncul paling besar akibat terjadinya lonjakan beban pada saat interkoneksi awal sistem kelistrikan 150 kV PLTMG Kastela 30 MW.  Tetap tidak berlangsung lama karena dilihat dari hasil simulasi akan kembali normal setelah sistem mulai stabil kembali.","PeriodicalId":36368,"journal":{"name":"AIUB Journal of Science and Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-08-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALISIS DAN SIMULASI TEGANGAN DIP PADA INTERKONEKSI SISTEM KELISTRIKAN 150 KV - PLTMG KASTELA 30 MW\",\"authors\":\"Mochammad Apriyadi Hadi Sirad\",\"doi\":\"10.33387/josae.v5i1.4878\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Berdasarkan hasil simulasi dapat disimpulkan bahwa tegangan dip yang muncul paling besar akibat terjadinya lonjakan beban pada saat interkoneksi awal sistem kelistrikan 150 kV PLTMG Kastela 30 MW.  Tetap tidak berlangsung lama karena dilihat dari hasil simulasi akan kembali normal setelah sistem mulai stabil kembali.\",\"PeriodicalId\":36368,\"journal\":{\"name\":\"AIUB Journal of Science and Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"AIUB Journal of Science and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33387/josae.v5i1.4878\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Mathematics\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"AIUB Journal of Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33387/josae.v5i1.4878","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Mathematics","Score":null,"Total":0}
引用次数: 0

摘要

根据模拟结果,可以得出结论,在连接系统前150 kV PLTMG Kastela 30兆瓦时,电压的峰值可能是最大的。不会持续太久,因为根据模拟结果,一旦系统重新稳定下来,模拟结果就会恢复正常。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS DAN SIMULASI TEGANGAN DIP PADA INTERKONEKSI SISTEM KELISTRIKAN 150 KV - PLTMG KASTELA 30 MW
Berdasarkan hasil simulasi dapat disimpulkan bahwa tegangan dip yang muncul paling besar akibat terjadinya lonjakan beban pada saat interkoneksi awal sistem kelistrikan 150 kV PLTMG Kastela 30 MW.  Tetap tidak berlangsung lama karena dilihat dari hasil simulasi akan kembali normal setelah sistem mulai stabil kembali.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
AIUB Journal of Science and Engineering
AIUB Journal of Science and Engineering Mathematics-Mathematics (miscellaneous)
CiteScore
1.00
自引率
0.00%
发文量
3
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信