印尼某制造厂发动机装配线单机太阳能光伏系统分析

Raja Dweyndo Hasintongan Gurning, I. Garniwa, Arum Kusuma Wardhany
{"title":"印尼某制造厂发动机装配线单机太阳能光伏系统分析","authors":"Raja Dweyndo Hasintongan Gurning, I. Garniwa, Arum Kusuma Wardhany","doi":"10.18178/IJOEE.6.2.92-96","DOIUrl":null,"url":null,"abstract":"Industrial sector is the third biggest energy consumption comes after household and transportation energy in Indonesia. To reduce the energy consumption of industry and also impact to reduce the manufacturing cost of the industry, solar photovoltaic on the rooftop of the factory can be an alternative solution to supply energy at engine assembly line, one section of production at the factory. This paper studies about the impact of utilization stand-alone photovoltaic at rooftop of factory building in Jakarta technically. The analysis is using spreadsheet program to compare between stand-alone photovoltaic with battery, stand-alone photovoltaic with diesel generator that operate only when there is no sunshine, and stand-alone photovoltaic with diesel generator that always operating. Simulation demonstrates with estimated available area 7.000 m2 to install photovoltaic array. Result of this research is the stand-alone photovoltaic scenario with battery fulfilled all the demand load by 947,17 kWp installed photovoltaic capacity. The scenarios with diesel generator reduced the photovoltaic generation contribution by 49,25% for 676,69 kWp installed photovoltaic capacity, and diesel generation operating tandem with 297,92 kWp installed photovoltaic capacity that contribute to 33,09% for fulfillment energy demand. The reduced capacity of photovoltaic that installed, the less contribution generation by renewable energy, and the less area that needed to be utilized for photovoltaic system.","PeriodicalId":13951,"journal":{"name":"International Journal of Electrical Energy","volume":"34 1","pages":"92-96"},"PeriodicalIF":0.0000,"publicationDate":"2018-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Stand-Alone Solar Photovoltaic System for Engine Assembly Line at Manufacturing Factory in Indonesia\",\"authors\":\"Raja Dweyndo Hasintongan Gurning, I. Garniwa, Arum Kusuma Wardhany\",\"doi\":\"10.18178/IJOEE.6.2.92-96\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Industrial sector is the third biggest energy consumption comes after household and transportation energy in Indonesia. To reduce the energy consumption of industry and also impact to reduce the manufacturing cost of the industry, solar photovoltaic on the rooftop of the factory can be an alternative solution to supply energy at engine assembly line, one section of production at the factory. This paper studies about the impact of utilization stand-alone photovoltaic at rooftop of factory building in Jakarta technically. The analysis is using spreadsheet program to compare between stand-alone photovoltaic with battery, stand-alone photovoltaic with diesel generator that operate only when there is no sunshine, and stand-alone photovoltaic with diesel generator that always operating. Simulation demonstrates with estimated available area 7.000 m2 to install photovoltaic array. Result of this research is the stand-alone photovoltaic scenario with battery fulfilled all the demand load by 947,17 kWp installed photovoltaic capacity. The scenarios with diesel generator reduced the photovoltaic generation contribution by 49,25% for 676,69 kWp installed photovoltaic capacity, and diesel generation operating tandem with 297,92 kWp installed photovoltaic capacity that contribute to 33,09% for fulfillment energy demand. The reduced capacity of photovoltaic that installed, the less contribution generation by renewable energy, and the less area that needed to be utilized for photovoltaic system.\",\"PeriodicalId\":13951,\"journal\":{\"name\":\"International Journal of Electrical Energy\",\"volume\":\"34 1\",\"pages\":\"92-96\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Electrical Energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18178/IJOEE.6.2.92-96\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Electrical Energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18178/IJOEE.6.2.92-96","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

工业部门是印尼继家庭和交通能源之后的第三大能源消耗部门。为了减少工业的能源消耗,也影响降低工业的制造成本,工厂屋顶的太阳能光伏可以作为工厂生产的一部分发动机装配线供电的替代解决方案。本文从技术上研究了雅加达厂房屋顶使用独立光伏发电的影响。分析采用电子表格程序对带蓄电池的单机光伏、无日照时运行的单机光伏带柴油发电机、无日照时运行的单机光伏带柴油发电机进行对比。模拟演示,估计可用面积为7000平方米安装光伏阵列。本研究的结果是,在单机光伏场景下,蓄电池以94717kwp的光伏装机容量满足了全部需求负荷。采用柴油发电机组的方案,光伏发电装机容量为676,69 kWp,减少了49.25%;采用柴油发电机组的方案,光伏发电装机容量为297,92 kWp,对满足能源需求的贡献率为33.09%。安装的光伏容量减少,可再生能源发电的贡献减少,光伏系统需要利用的面积也减少。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of Stand-Alone Solar Photovoltaic System for Engine Assembly Line at Manufacturing Factory in Indonesia
Industrial sector is the third biggest energy consumption comes after household and transportation energy in Indonesia. To reduce the energy consumption of industry and also impact to reduce the manufacturing cost of the industry, solar photovoltaic on the rooftop of the factory can be an alternative solution to supply energy at engine assembly line, one section of production at the factory. This paper studies about the impact of utilization stand-alone photovoltaic at rooftop of factory building in Jakarta technically. The analysis is using spreadsheet program to compare between stand-alone photovoltaic with battery, stand-alone photovoltaic with diesel generator that operate only when there is no sunshine, and stand-alone photovoltaic with diesel generator that always operating. Simulation demonstrates with estimated available area 7.000 m2 to install photovoltaic array. Result of this research is the stand-alone photovoltaic scenario with battery fulfilled all the demand load by 947,17 kWp installed photovoltaic capacity. The scenarios with diesel generator reduced the photovoltaic generation contribution by 49,25% for 676,69 kWp installed photovoltaic capacity, and diesel generation operating tandem with 297,92 kWp installed photovoltaic capacity that contribute to 33,09% for fulfillment energy demand. The reduced capacity of photovoltaic that installed, the less contribution generation by renewable energy, and the less area that needed to be utilized for photovoltaic system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信