{"title":"评估规划和考虑因素在基于ppp的快速公交项目可持续性中的作用:一个南非案例","authors":"C. Okoro, F. Muleya, I. Musonda","doi":"10.21315/jcdc-04-21-0064","DOIUrl":null,"url":null,"abstract":"The development of Bus Rapid Transit (BRT) systems is essential to African cities' economic vitality through accessibility and expansion of urban mobility. Several studies have investigated the deployment of such transportation systems. However, the role of a delineated planning stage of BRTs has been given limited attention. This study examined the role of planning in ensuring the sustainable performance of BRT systems. A qualitative approach using interviews from experts and BRT users in the Gauteng Province of South Africa was adopted. Findings indicated that planning should extensively encompass projections of the intended or future performance outcomes. These include institutional arrangements, existing characteristics and impact, service reliability and quality, technical analysis of infrastructural integration, demand, environmental performance metrics, and life cycle costs. This inductive research advances theory on critical factors that could potentially hinder the delivery of PPP-based BRT projects. The findings are envisaged to be beneficial to transport policymakers and stakeholders in the assessment of BRT systems. Failures surrounding the BRT in Gauteng result from an omission of critical factors at the planning stage. This presents a critical lesson for future BRT projects in South Africa and other developing countries, to be meticulous and consider critical factors at the planning stage.","PeriodicalId":51876,"journal":{"name":"Journal of Construction in Developing Countries","volume":"11 1","pages":""},"PeriodicalIF":0.8000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessing the Role of Planning and Considerations in the Sustainability of PPP-Based BRT Projects: A South African Case\",\"authors\":\"C. Okoro, F. Muleya, I. Musonda\",\"doi\":\"10.21315/jcdc-04-21-0064\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development of Bus Rapid Transit (BRT) systems is essential to African cities' economic vitality through accessibility and expansion of urban mobility. Several studies have investigated the deployment of such transportation systems. However, the role of a delineated planning stage of BRTs has been given limited attention. This study examined the role of planning in ensuring the sustainable performance of BRT systems. A qualitative approach using interviews from experts and BRT users in the Gauteng Province of South Africa was adopted. Findings indicated that planning should extensively encompass projections of the intended or future performance outcomes. These include institutional arrangements, existing characteristics and impact, service reliability and quality, technical analysis of infrastructural integration, demand, environmental performance metrics, and life cycle costs. This inductive research advances theory on critical factors that could potentially hinder the delivery of PPP-based BRT projects. The findings are envisaged to be beneficial to transport policymakers and stakeholders in the assessment of BRT systems. Failures surrounding the BRT in Gauteng result from an omission of critical factors at the planning stage. This presents a critical lesson for future BRT projects in South Africa and other developing countries, to be meticulous and consider critical factors at the planning stage.\",\"PeriodicalId\":51876,\"journal\":{\"name\":\"Journal of Construction in Developing Countries\",\"volume\":\"11 1\",\"pages\":\"\"},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Construction in Developing Countries\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21315/jcdc-04-21-0064\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Construction in Developing Countries","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21315/jcdc-04-21-0064","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
Assessing the Role of Planning and Considerations in the Sustainability of PPP-Based BRT Projects: A South African Case
The development of Bus Rapid Transit (BRT) systems is essential to African cities' economic vitality through accessibility and expansion of urban mobility. Several studies have investigated the deployment of such transportation systems. However, the role of a delineated planning stage of BRTs has been given limited attention. This study examined the role of planning in ensuring the sustainable performance of BRT systems. A qualitative approach using interviews from experts and BRT users in the Gauteng Province of South Africa was adopted. Findings indicated that planning should extensively encompass projections of the intended or future performance outcomes. These include institutional arrangements, existing characteristics and impact, service reliability and quality, technical analysis of infrastructural integration, demand, environmental performance metrics, and life cycle costs. This inductive research advances theory on critical factors that could potentially hinder the delivery of PPP-based BRT projects. The findings are envisaged to be beneficial to transport policymakers and stakeholders in the assessment of BRT systems. Failures surrounding the BRT in Gauteng result from an omission of critical factors at the planning stage. This presents a critical lesson for future BRT projects in South Africa and other developing countries, to be meticulous and consider critical factors at the planning stage.
期刊介绍:
The Journal of Construction in Developing Countries seeks to provide a central vehicle for the exchange and dissemination of knowledge on issues relevant to the built environment of developing countries. The journal provides a wide range of original research an application papers on current developments and advances in the built environment as well as the economic, social, cultural and technological contexts of developing countries. It also publishes detailed case studies, as well as short communications and discussions. Topics covered include, but are not restricted to planning, urban economics, rural and regional development, housing, management and resource issues, sustiainability, knowledge and technology transfer, construction procurement, facilities management, information an communication technologies, strategies and policy issues, design issues, conservation and environmental issues.