Pelješac大桥,Croatia Part 1: Concept与设计/ Pelješac-Brücke克罗地亚、- 1部分:概念和规划

IF 0.4 4区 工程技术 Q4 CONSTRUCTION & BUILDING TECHNOLOGY
Marjan Pipenbaher
{"title":"Pelješac大桥,Croatia Part 1: Concept与设计/ Pelješac-Brücke克罗地亚、- 1部分:概念和规划","authors":"Marjan Pipenbaher","doi":"10.37544/0005-6650-2023-05-39","DOIUrl":null,"url":null,"abstract":"The 2 404 m long Pelješac Bridge, Croatia, ranks among the most demanding bridges in the Europe in terms of both the technological complexity of construction and the complexity of the design. The bridge is located in an area of very high seismic activity, exposed to strong and gusty north and south winds. The compact bedrock is located at a depth of up to 100 m below the seabed so very demanding foundation on up to 128 m long driven steel piles was required. The bridge is designed as a multi-span cable-stayed bridge with a semi-integral hybrid structure with five 285 m long central spans. Part 2 deals with execution and assembly.","PeriodicalId":55399,"journal":{"name":"Bauingenieur","volume":"57 1","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Pelješac bridge, Croatia – Part 1: Concept and Design/Pelješac-Brücke, Kroatien – Teil 1: Konzept und Planung\",\"authors\":\"Marjan Pipenbaher\",\"doi\":\"10.37544/0005-6650-2023-05-39\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The 2 404 m long Pelješac Bridge, Croatia, ranks among the most demanding bridges in the Europe in terms of both the technological complexity of construction and the complexity of the design. The bridge is located in an area of very high seismic activity, exposed to strong and gusty north and south winds. The compact bedrock is located at a depth of up to 100 m below the seabed so very demanding foundation on up to 128 m long driven steel piles was required. The bridge is designed as a multi-span cable-stayed bridge with a semi-integral hybrid structure with five 285 m long central spans. Part 2 deals with execution and assembly.\",\"PeriodicalId\":55399,\"journal\":{\"name\":\"Bauingenieur\",\"volume\":\"57 1\",\"pages\":\"\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bauingenieur\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.37544/0005-6650-2023-05-39\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bauingenieur","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.37544/0005-6650-2023-05-39","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

克罗地亚的Pelješac大桥长2404米,在施工技术复杂性和设计复杂性方面都是欧洲要求最高的桥梁之一。这座桥位于一个地震活动非常频繁的地区,暴露在强烈的北风和南风中。紧凑的基岩位于海床以下100米的深度,因此需要在长达128米的钢桩上建立非常苛刻的基础。该桥设计为半整体混合结构的多跨斜拉桥,有五个285米长的中心跨。第2部分讨论执行和汇编。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Pelješac bridge, Croatia – Part 1: Concept and Design/Pelješac-Brücke, Kroatien – Teil 1: Konzept und Planung
The 2 404 m long Pelješac Bridge, Croatia, ranks among the most demanding bridges in the Europe in terms of both the technological complexity of construction and the complexity of the design. The bridge is located in an area of very high seismic activity, exposed to strong and gusty north and south winds. The compact bedrock is located at a depth of up to 100 m below the seabed so very demanding foundation on up to 128 m long driven steel piles was required. The bridge is designed as a multi-span cable-stayed bridge with a semi-integral hybrid structure with five 285 m long central spans. Part 2 deals with execution and assembly.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Bauingenieur
Bauingenieur 工程技术-工程:土木
CiteScore
0.90
自引率
16.70%
发文量
66
审稿时长
6-12 weeks
期刊介绍: Die Zeitschrift Bauingenieur bietet Aufsätze über Theorie und Praxis des konstruktiven Ingenieurbaus, der Mechanik, der Geotechnik und des Baubetriebs und Baumanagements. Darüber hinaus enthält die Zeitschrift Bauingenieur Berichte und Reportagen über interessante Bauausführungen und Bausanierungen im In- und Ausland, Baustofffragen und Bauinformatik.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信