渝油田区块导井移动式气举装置技术的开发与实现Korchagin For Artificial Lift

A. Zavyalov, I. Yazykov, M. Nukhaev, K. Rymarenko, S. Grishenko, A. Golubtsov, Galymzhan Aitkaliev, V. Kabanov
{"title":"渝油田区块导井移动式气举装置技术的开发与实现Korchagin For Artificial Lift","authors":"A. Zavyalov, I. Yazykov, M. Nukhaev, K. Rymarenko, S. Grishenko, A. Golubtsov, Galymzhan Aitkaliev, V. Kabanov","doi":"10.2118/206471-ms","DOIUrl":null,"url":null,"abstract":"\n This paper is aimed at the mobile gas-lift unit installation workup to shift the wells of the conductor platform of the Yu. Korchagin field to mechanized extraction instead of constructing a gas lift pipeline. The paper presents all the stages of this technology implementation, from conceptual design, engineering calculations, to the economic feasibility study, implementation and operation of this unit.\n During the operation of the wells of the conductor platform at the Yu. Korchagin field, the following problem occurred: a gas-lift gas pipeline was not constructed from the offshore ice-resistant fixed platform to the conductor platform, as they wanted to shift the wells to the mechanized extraction method (artificial lift). An alternative option to provide gas-lift gas to the wells of the conductor platform is to install a mobile gas-lift unit directly on an unmanned platform.\n This mobile gas-lift unit will be a compact separator of a gas-liquid mixture from a donor well, and it will pipe a separated gas-lift gas supply system with control and flow metering sets into the production wells. This system enables a shift of the wells of an unmanned conductor platform to a compressor-less gas-lift operation and a remote regulation of production and control over the wells operation.","PeriodicalId":11052,"journal":{"name":"Day 3 Thu, October 14, 2021","volume":"5 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development and Implementation of the Technology of a Mobile Gas-Lift Complex For Transferring Wells of the Block-Conductor of the Field Named After Yu. Korchagin For Artificial Lift\",\"authors\":\"A. Zavyalov, I. Yazykov, M. Nukhaev, K. Rymarenko, S. Grishenko, A. Golubtsov, Galymzhan Aitkaliev, V. Kabanov\",\"doi\":\"10.2118/206471-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper is aimed at the mobile gas-lift unit installation workup to shift the wells of the conductor platform of the Yu. Korchagin field to mechanized extraction instead of constructing a gas lift pipeline. The paper presents all the stages of this technology implementation, from conceptual design, engineering calculations, to the economic feasibility study, implementation and operation of this unit.\\n During the operation of the wells of the conductor platform at the Yu. Korchagin field, the following problem occurred: a gas-lift gas pipeline was not constructed from the offshore ice-resistant fixed platform to the conductor platform, as they wanted to shift the wells to the mechanized extraction method (artificial lift). An alternative option to provide gas-lift gas to the wells of the conductor platform is to install a mobile gas-lift unit directly on an unmanned platform.\\n This mobile gas-lift unit will be a compact separator of a gas-liquid mixture from a donor well, and it will pipe a separated gas-lift gas supply system with control and flow metering sets into the production wells. This system enables a shift of the wells of an unmanned conductor platform to a compressor-less gas-lift operation and a remote regulation of production and control over the wells operation.\",\"PeriodicalId\":11052,\"journal\":{\"name\":\"Day 3 Thu, October 14, 2021\",\"volume\":\"5 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, October 14, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/206471-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, October 14, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/206471-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文针对于油田导管平台的移动式气举装置进行了井移作业。Korchagin油田将采用机械化开采而不是建造气举管道。本文介绍了该技术实施的各个阶段,从概念设计、工程计算到经济可行性研究、实施和运行。在Yu指挥平台的井作业期间。在Korchagin油田,出现了以下问题:由于他们希望将井转移到机械化开采方法(人工举升),因此没有从海上防冰固定平台到指挥平台建造气举天然气管道。为导管平台的井提供气举气的另一种选择是直接在无人平台上安装移动式气举装置。这种移动式气举装置是一种紧凑的气液混合物分离器,它将带控制和流量计量装置的分离气举供气系统输送到生产井中。该系统可以将无人指挥平台的井转移到无压缩机的气举作业中,并可以远程调节生产和控制井的运行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Development and Implementation of the Technology of a Mobile Gas-Lift Complex For Transferring Wells of the Block-Conductor of the Field Named After Yu. Korchagin For Artificial Lift
This paper is aimed at the mobile gas-lift unit installation workup to shift the wells of the conductor platform of the Yu. Korchagin field to mechanized extraction instead of constructing a gas lift pipeline. The paper presents all the stages of this technology implementation, from conceptual design, engineering calculations, to the economic feasibility study, implementation and operation of this unit. During the operation of the wells of the conductor platform at the Yu. Korchagin field, the following problem occurred: a gas-lift gas pipeline was not constructed from the offshore ice-resistant fixed platform to the conductor platform, as they wanted to shift the wells to the mechanized extraction method (artificial lift). An alternative option to provide gas-lift gas to the wells of the conductor platform is to install a mobile gas-lift unit directly on an unmanned platform. This mobile gas-lift unit will be a compact separator of a gas-liquid mixture from a donor well, and it will pipe a separated gas-lift gas supply system with control and flow metering sets into the production wells. This system enables a shift of the wells of an unmanned conductor platform to a compressor-less gas-lift operation and a remote regulation of production and control over the wells operation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信