{"title":"修复已运行的组合隔热卷屋顶的建议","authors":"V. N. Chernoivan, N. Chernoivan, A. V. Torkhova","doi":"10.21122/2227-1031-2022-21-1-50-56","DOIUrl":null,"url":null,"abstract":"Combined insulated rolled roofs, all layers of which are sequentially laid on the supporting structure and covered with a waterproof carpet, make up more than 80 % of the roofs of residential and public buildings in operation and under construction. Such a significant number of structures with a combined roll roofing in the Republic of Belarus is due to the fact that in the early 70s of the last century, a program for the development of prefabricated housing was launched in the Soviet Union. As practice has shown, after three to five years of operation, the combined insulated roll roofs needed current repairs – to eliminate leaks. The repair basically boiled down to the gluing of additional layers of rolled waterproofing material in the areas of roof leaks. Field studies have allowed us to establish the reasons why, in less than 10–12 years of operation, the combined insulated rolled roofs need major repairs. The analysis of the results of field studies has shown that the main factor affecting the failure of the roof is the high humidity of the insulation material. The main reason for moistening the material of the thermal insulation layer during the operation of the roof is the destruction of the vapor barrier layer. Based on the results of the performed field studies and regulatory documents of the Republic of Belarus, the authors of the publication offer a constructive solution and technology of work for the rehabilitation of operated combined insulated rolled roofs. The mainadvantages of the proposed solution are: provision of any thermal resistance to heat transfer of the combined coating without dismantling the structural elements of the existing roof; use of PVC membranes as a water-insulating carpet, which will allow to eliminate roof leaks within 20 years of operation without additional costs.","PeriodicalId":42375,"journal":{"name":"Science & Technique","volume":null,"pages":null},"PeriodicalIF":0.3000,"publicationDate":"2022-02-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Proposals for Rehabilitation of Operated Combined Insulated Rolled Roofs\",\"authors\":\"V. N. Chernoivan, N. Chernoivan, A. V. Torkhova\",\"doi\":\"10.21122/2227-1031-2022-21-1-50-56\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Combined insulated rolled roofs, all layers of which are sequentially laid on the supporting structure and covered with a waterproof carpet, make up more than 80 % of the roofs of residential and public buildings in operation and under construction. Such a significant number of structures with a combined roll roofing in the Republic of Belarus is due to the fact that in the early 70s of the last century, a program for the development of prefabricated housing was launched in the Soviet Union. As practice has shown, after three to five years of operation, the combined insulated roll roofs needed current repairs – to eliminate leaks. The repair basically boiled down to the gluing of additional layers of rolled waterproofing material in the areas of roof leaks. Field studies have allowed us to establish the reasons why, in less than 10–12 years of operation, the combined insulated rolled roofs need major repairs. The analysis of the results of field studies has shown that the main factor affecting the failure of the roof is the high humidity of the insulation material. The main reason for moistening the material of the thermal insulation layer during the operation of the roof is the destruction of the vapor barrier layer. Based on the results of the performed field studies and regulatory documents of the Republic of Belarus, the authors of the publication offer a constructive solution and technology of work for the rehabilitation of operated combined insulated rolled roofs. The mainadvantages of the proposed solution are: provision of any thermal resistance to heat transfer of the combined coating without dismantling the structural elements of the existing roof; use of PVC membranes as a water-insulating carpet, which will allow to eliminate roof leaks within 20 years of operation without additional costs.\",\"PeriodicalId\":42375,\"journal\":{\"name\":\"Science & Technique\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.3000,\"publicationDate\":\"2022-02-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Science & Technique\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21122/2227-1031-2022-21-1-50-56\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Science & Technique","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21122/2227-1031-2022-21-1-50-56","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

组合式保温卷屋顶,其所有层依次铺设在支撑结构上,并覆盖防水地毯,占正在运营和在建的住宅和公共建筑屋顶的80%以上。白俄罗斯共和国之所以有如此多的组合卷筒屋顶结构,是因为在上世纪70年代初,苏联启动了一项开发预制房屋的计划。实践表明,经过三到五年的运行,组合式隔热卷屋顶需要当前的维修,以消除泄漏。修复工作基本上归结为在屋顶漏水的地方粘贴额外的防水卷材。实地研究使我们能够确定在不到10-12年的运行中,组合隔热卷屋顶需要大修的原因。对现场研究结果的分析表明,影响屋面破坏的主要因素是保温材料的高湿。屋面在运行过程中,保温层材料受潮的主要原因是蒸汽阻隔层的破坏。根据进行的实地研究和白俄罗斯共和国的规范性文件的结果,该出版物的作者提供了一个建设性的解决方案和工作技术,以恢复运行的组合绝缘卷屋顶。提出的解决方案的主要优点是:在不拆除现有屋顶结构元件的情况下,提供复合涂层的热阻传热;使用PVC膜作为防水地毯,这将允许在20年内消除屋顶泄漏,而无需额外成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Proposals for Rehabilitation of Operated Combined Insulated Rolled Roofs
Combined insulated rolled roofs, all layers of which are sequentially laid on the supporting structure and covered with a waterproof carpet, make up more than 80 % of the roofs of residential and public buildings in operation and under construction. Such a significant number of structures with a combined roll roofing in the Republic of Belarus is due to the fact that in the early 70s of the last century, a program for the development of prefabricated housing was launched in the Soviet Union. As practice has shown, after three to five years of operation, the combined insulated roll roofs needed current repairs – to eliminate leaks. The repair basically boiled down to the gluing of additional layers of rolled waterproofing material in the areas of roof leaks. Field studies have allowed us to establish the reasons why, in less than 10–12 years of operation, the combined insulated rolled roofs need major repairs. The analysis of the results of field studies has shown that the main factor affecting the failure of the roof is the high humidity of the insulation material. The main reason for moistening the material of the thermal insulation layer during the operation of the roof is the destruction of the vapor barrier layer. Based on the results of the performed field studies and regulatory documents of the Republic of Belarus, the authors of the publication offer a constructive solution and technology of work for the rehabilitation of operated combined insulated rolled roofs. The mainadvantages of the proposed solution are: provision of any thermal resistance to heat transfer of the combined coating without dismantling the structural elements of the existing roof; use of PVC membranes as a water-insulating carpet, which will allow to eliminate roof leaks within 20 years of operation without additional costs.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Science & Technique
Science & Technique ENGINEERING, MULTIDISCIPLINARY-
自引率
50.00%
发文量
47
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信