{"title":"印尼Pelabuhan三厂(Persero)实施绩效合同的准备程度分析","authors":"Angga Tri Wibowo, I. Wiguna","doi":"10.12962/j23546026.y2020i6.11112","DOIUrl":null,"url":null,"abstract":"The type of contract for the road project used in PT Pelabuhan Indonesia III (Persero) is currently using the type of General Contracting. The contract is conventional and is considered to have many weaknesses. To obtain more optimal project results and maintenance can run optimally, in addition to improving quality control by the project supervisory team, one way that can be done is to change the use of innovative types of contracts. namely Performance Based Contracts (PBC). When implementing the PBC for the first time, there are several things that must be prepared, one of which is the readiness of the owner and contractor. Analysis in this study uses Structural Equation Modeling (SEM). The results obtained are that the variable readiness to use PBC has a positive effect on the application of PBC. If the readiness variable increases by one unit and the other variables are considered constant then the PBC implementation variable will increase by 0.390. Keywords—Conventional Contracts, Performance Based Contract, SEM.","PeriodicalId":14533,"journal":{"name":"IPTEK Journal of Proceedings Series","volume":"30 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis Effect on Readiness to the Implementation of Performance Based Contract (PBC) in PT Pelabuhan Indonesia III (Persero)\",\"authors\":\"Angga Tri Wibowo, I. Wiguna\",\"doi\":\"10.12962/j23546026.y2020i6.11112\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The type of contract for the road project used in PT Pelabuhan Indonesia III (Persero) is currently using the type of General Contracting. The contract is conventional and is considered to have many weaknesses. To obtain more optimal project results and maintenance can run optimally, in addition to improving quality control by the project supervisory team, one way that can be done is to change the use of innovative types of contracts. namely Performance Based Contracts (PBC). When implementing the PBC for the first time, there are several things that must be prepared, one of which is the readiness of the owner and contractor. Analysis in this study uses Structural Equation Modeling (SEM). The results obtained are that the variable readiness to use PBC has a positive effect on the application of PBC. If the readiness variable increases by one unit and the other variables are considered constant then the PBC implementation variable will increase by 0.390. Keywords—Conventional Contracts, Performance Based Contract, SEM.\",\"PeriodicalId\":14533,\"journal\":{\"name\":\"IPTEK Journal of Proceedings Series\",\"volume\":\"30 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IPTEK Journal of Proceedings Series\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12962/j23546026.y2020i6.11112\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IPTEK Journal of Proceedings Series","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12962/j23546026.y2020i6.11112","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
Pelabuhan Indonesia III (Persero)公路项目使用的合同类型目前是总承包类型。该合同是传统的,被认为有许多弱点。为了获得更优的项目结果和维护能够最优运行,除了由项目监督团队改进质量控制外,可以做的一种方法是改变使用创新类型的合同。即绩效合同(PBC)。在首次实施PBC时,有几件事必须准备好,其中之一是业主和承包商的准备情况。本研究采用结构方程模型(SEM)进行分析。结果表明,可变的PBC使用准备度对PBC的应用有积极的影响。如果准备变量增加一个单位,而其他变量被认为是恒定的,那么PBC实现变量将增加0.390。关键词:常规合同,履约合同,SEM。
Analysis Effect on Readiness to the Implementation of Performance Based Contract (PBC) in PT Pelabuhan Indonesia III (Persero)
The type of contract for the road project used in PT Pelabuhan Indonesia III (Persero) is currently using the type of General Contracting. The contract is conventional and is considered to have many weaknesses. To obtain more optimal project results and maintenance can run optimally, in addition to improving quality control by the project supervisory team, one way that can be done is to change the use of innovative types of contracts. namely Performance Based Contracts (PBC). When implementing the PBC for the first time, there are several things that must be prepared, one of which is the readiness of the owner and contractor. Analysis in this study uses Structural Equation Modeling (SEM). The results obtained are that the variable readiness to use PBC has a positive effect on the application of PBC. If the readiness variable increases by one unit and the other variables are considered constant then the PBC implementation variable will increase by 0.390. Keywords—Conventional Contracts, Performance Based Contract, SEM.