S. Acha, James Fadairo, Dennis Ogiesoba, Ikenna J. Okeke, Tata Emmanuel, Joseph A. Brown
{"title":"在布朗油田作业中实现和保持无可挑剔的HSE性能是需要付出代价的","authors":"S. Acha, James Fadairo, Dennis Ogiesoba, Ikenna J. Okeke, Tata Emmanuel, Joseph A. Brown","doi":"10.2118/198801-MS","DOIUrl":null,"url":null,"abstract":"\n The Nigerian Petroleum Development Company Limited (NPDC), and First Hydrocarbon Nigeria (FHN) its joint venture partner in Oil Mining Lease (OML) 26, established OML 26 Asset Management Team (AMT) to manage the lease together with all the assets and facilities on behalf of the joint venture (JV). The facilities include the flow station, the compressor station, and the gantry at Ogini field, a LACT Unit at Eriemu, and Operational Base for alternative evacuation in Asaba – Ase all in Delta State, Nigeria.\n Since the inception of the AMT in 2016, the asset has achieved and maintained a GOAL ZERO HSE performance record. Achieving GOAL ZERO HSE performance in a brown field like OML 26 is a herculean task. It is so, considering the operational challenges that require aggressive interventions in the forms of various projects, and the increased field activities. The debottlenecking activities results in more manhours, greater exposures and a high propensity for environmental impact. In line with the vision of the AMT to be the Best Performing Energy Investment (BPEI) the HSE department established a proactive system for identifying and managing operational risks and ensuring regulatory compliance consistently.\n This paper highlights the tremendous efforts, strategies and policies of the HSE department in ensuring success and meeting set HSE goals. It focuses on the costs in terms of commitments, governance and drive at all levels in achieving a sustained impressive performance and compliance to regulatory and international standards.","PeriodicalId":11110,"journal":{"name":"Day 2 Tue, August 06, 2019","volume":"31 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Achieving & Sustaining Impeccable HSE Performance in Brown Field Operations Comes at a Cost OML26 Blazes the Trail\",\"authors\":\"S. Acha, James Fadairo, Dennis Ogiesoba, Ikenna J. Okeke, Tata Emmanuel, Joseph A. Brown\",\"doi\":\"10.2118/198801-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The Nigerian Petroleum Development Company Limited (NPDC), and First Hydrocarbon Nigeria (FHN) its joint venture partner in Oil Mining Lease (OML) 26, established OML 26 Asset Management Team (AMT) to manage the lease together with all the assets and facilities on behalf of the joint venture (JV). The facilities include the flow station, the compressor station, and the gantry at Ogini field, a LACT Unit at Eriemu, and Operational Base for alternative evacuation in Asaba – Ase all in Delta State, Nigeria.\\n Since the inception of the AMT in 2016, the asset has achieved and maintained a GOAL ZERO HSE performance record. Achieving GOAL ZERO HSE performance in a brown field like OML 26 is a herculean task. It is so, considering the operational challenges that require aggressive interventions in the forms of various projects, and the increased field activities. The debottlenecking activities results in more manhours, greater exposures and a high propensity for environmental impact. In line with the vision of the AMT to be the Best Performing Energy Investment (BPEI) the HSE department established a proactive system for identifying and managing operational risks and ensuring regulatory compliance consistently.\\n This paper highlights the tremendous efforts, strategies and policies of the HSE department in ensuring success and meeting set HSE goals. It focuses on the costs in terms of commitments, governance and drive at all levels in achieving a sustained impressive performance and compliance to regulatory and international standards.\",\"PeriodicalId\":11110,\"journal\":{\"name\":\"Day 2 Tue, August 06, 2019\",\"volume\":\"31 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-08-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, August 06, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/198801-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, August 06, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/198801-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
尼日利亚石油开发有限公司(NPDC)及其石油开采租赁(OML) 26的合资伙伴First Hydrocarbon Nigeria (FHN)成立了OML 26资产管理团队(AMT),代表合资企业(JV)管理租赁以及所有资产和设施。这些设施包括Ogini油田的流量站、压缩机站和龙门台,Eriemu的LACT单位,以及尼日利亚三角洲州Asaba - Ase all的替代疏散操作基地。自2016年AMT启动以来,该资产已经实现并保持了GOAL ZERO的HSE绩效记录。在像oml26这样的棕色油田中实现GOAL ZERO HSE性能是一项艰巨的任务。考虑到需要以各种项目的形式积极干预的业务挑战,以及外地活动的增加,情况的确如此。消除瓶颈的活动导致更多的工时,更大的暴露和对环境影响的高倾向。为了实现AMT成为最佳能源投资(BPEI)的愿景,HSE部门建立了一个主动系统来识别和管理运营风险,并确保始终遵守法规。本文重点介绍了HSE部门在确保成功和实现既定HSE目标方面所做的巨大努力、战略和政策。它侧重于在实现持续的令人印象深刻的绩效和遵守法规和国际标准的所有层面上的承诺、治理和驱动方面的成本。
Achieving & Sustaining Impeccable HSE Performance in Brown Field Operations Comes at a Cost OML26 Blazes the Trail
The Nigerian Petroleum Development Company Limited (NPDC), and First Hydrocarbon Nigeria (FHN) its joint venture partner in Oil Mining Lease (OML) 26, established OML 26 Asset Management Team (AMT) to manage the lease together with all the assets and facilities on behalf of the joint venture (JV). The facilities include the flow station, the compressor station, and the gantry at Ogini field, a LACT Unit at Eriemu, and Operational Base for alternative evacuation in Asaba – Ase all in Delta State, Nigeria.
Since the inception of the AMT in 2016, the asset has achieved and maintained a GOAL ZERO HSE performance record. Achieving GOAL ZERO HSE performance in a brown field like OML 26 is a herculean task. It is so, considering the operational challenges that require aggressive interventions in the forms of various projects, and the increased field activities. The debottlenecking activities results in more manhours, greater exposures and a high propensity for environmental impact. In line with the vision of the AMT to be the Best Performing Energy Investment (BPEI) the HSE department established a proactive system for identifying and managing operational risks and ensuring regulatory compliance consistently.
This paper highlights the tremendous efforts, strategies and policies of the HSE department in ensuring success and meeting set HSE goals. It focuses on the costs in terms of commitments, governance and drive at all levels in achieving a sustained impressive performance and compliance to regulatory and international standards.