欧洲造船业中造船策略与造船时间的关系

IF 1.5 4区 工程技术 Q3 ENGINEERING, MARINE
M. Semini, Clara Patek, P. O. Brett, Jose Jorge Garcia Agis, J. Strandhagen, J. Vatn
{"title":"欧洲造船业中造船策略与造船时间的关系","authors":"M. Semini, Clara Patek, P. O. Brett, Jose Jorge Garcia Agis, J. Strandhagen, J. Vatn","doi":"10.1177/14750902221141749","DOIUrl":null,"url":null,"abstract":"The build strategy of a ship specifies what is to be produced how, when, where and with what resources. Although it has been emphasised to play an important role in determining shipbuilding time and cost, scientific research on build strategy is limited. In this study, we focus on three interrelated build strategic factors of particular importance in European shipbuilding: hull production offshoring, pre-erection outfitting and the overlap between engineering and production. The study investigates how each of these three factors relates to physical ship production time and to total ship delivery time from contract signing to delivery. We use multiple linear regression on data about European shipyards and the ships they have built, which were obtained from a questionnaire and ship databases. The sample consists of 76 specialised ships, predominantly offshore support vessels, fishing vessels, ferries and other non-cargo carrying vessels, built at 24 European yards. The results provide evidence that yards practicing hull production offshoring have shorter ship production and delivery times than yards building the hulls at their own premises, even though the practice of offshoring itself is likely to have an adverse effect on shipbuilding time. The study also found a significant relationship between the level of pre-erection outfitting and physical production time. On the other hand, overlapping engineering and production only seems to have a limited impact on the production and the delivery time. Several of our results challenge established thinking and provide new insights into the factors affecting production and delivery time in European shipbuilding.","PeriodicalId":20667,"journal":{"name":"Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment","volume":"50 3 1","pages":"658 - 676"},"PeriodicalIF":1.5000,"publicationDate":"2023-01-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Some relationships between build strategy and shipbuilding time in European shipbuilding\",\"authors\":\"M. Semini, Clara Patek, P. O. Brett, Jose Jorge Garcia Agis, J. Strandhagen, J. Vatn\",\"doi\":\"10.1177/14750902221141749\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The build strategy of a ship specifies what is to be produced how, when, where and with what resources. Although it has been emphasised to play an important role in determining shipbuilding time and cost, scientific research on build strategy is limited. In this study, we focus on three interrelated build strategic factors of particular importance in European shipbuilding: hull production offshoring, pre-erection outfitting and the overlap between engineering and production. The study investigates how each of these three factors relates to physical ship production time and to total ship delivery time from contract signing to delivery. We use multiple linear regression on data about European shipyards and the ships they have built, which were obtained from a questionnaire and ship databases. The sample consists of 76 specialised ships, predominantly offshore support vessels, fishing vessels, ferries and other non-cargo carrying vessels, built at 24 European yards. The results provide evidence that yards practicing hull production offshoring have shorter ship production and delivery times than yards building the hulls at their own premises, even though the practice of offshoring itself is likely to have an adverse effect on shipbuilding time. The study also found a significant relationship between the level of pre-erection outfitting and physical production time. On the other hand, overlapping engineering and production only seems to have a limited impact on the production and the delivery time. Several of our results challenge established thinking and provide new insights into the factors affecting production and delivery time in European shipbuilding.\",\"PeriodicalId\":20667,\"journal\":{\"name\":\"Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment\",\"volume\":\"50 3 1\",\"pages\":\"658 - 676\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2023-01-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1177/14750902221141749\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, MARINE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1177/14750902221141749","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MARINE","Score":null,"Total":0}
引用次数: 0

摘要

一艘船的建造策略规定了如何、何时、何地以及用什么资源生产什么东西。尽管建造策略在决定造船时间和成本方面发挥着重要作用,但对建造策略的科学研究却很有限。在本研究中,我们将重点关注欧洲造船业中特别重要的三个相互关联的建造战略因素:离岸船体生产、安装前舾装以及工程和生产之间的重叠。该研究调查了这三个因素中的每一个与船舶实际生产时间和船舶从合同签订到交付的总交付时间之间的关系。我们对欧洲造船厂和他们建造的船舶的数据使用多元线性回归,这些数据是从问卷调查和船舶数据库中获得的。样本包括76艘专业船只,主要是在24家欧洲船厂建造的近海支援船、渔船、渡轮和其他非载货船只。研究结果表明,尽管离岸生产本身可能会对造船时间产生不利影响,但实践离岸船体生产的船厂比在自己的场地建造船体的船厂的船舶生产和交付时间更短。研究还发现,安装前装备水平与实际生产时间之间存在显著关系。另一方面,工程和生产的重叠似乎对生产和交货时间的影响有限。我们的一些结果挑战了既定的思维,并为影响欧洲造船业生产和交货时间的因素提供了新的见解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Some relationships between build strategy and shipbuilding time in European shipbuilding
The build strategy of a ship specifies what is to be produced how, when, where and with what resources. Although it has been emphasised to play an important role in determining shipbuilding time and cost, scientific research on build strategy is limited. In this study, we focus on three interrelated build strategic factors of particular importance in European shipbuilding: hull production offshoring, pre-erection outfitting and the overlap between engineering and production. The study investigates how each of these three factors relates to physical ship production time and to total ship delivery time from contract signing to delivery. We use multiple linear regression on data about European shipyards and the ships they have built, which were obtained from a questionnaire and ship databases. The sample consists of 76 specialised ships, predominantly offshore support vessels, fishing vessels, ferries and other non-cargo carrying vessels, built at 24 European yards. The results provide evidence that yards practicing hull production offshoring have shorter ship production and delivery times than yards building the hulls at their own premises, even though the practice of offshoring itself is likely to have an adverse effect on shipbuilding time. The study also found a significant relationship between the level of pre-erection outfitting and physical production time. On the other hand, overlapping engineering and production only seems to have a limited impact on the production and the delivery time. Several of our results challenge established thinking and provide new insights into the factors affecting production and delivery time in European shipbuilding.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.90
自引率
11.10%
发文量
77
审稿时长
>12 weeks
期刊介绍: The Journal of Engineering for the Maritime Environment is concerned with the design, production and operation of engineering artefacts for the maritime environment. The journal straddles the traditional boundaries of naval architecture, marine engineering, offshore/ocean engineering, coastal engineering and port engineering.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信