泗水中央商务区公寓开发中装修质量提升分析

Safira Damayanti, I. Wiguna
{"title":"泗水中央商务区公寓开发中装修质量提升分析","authors":"Safira Damayanti, I. Wiguna","doi":"10.12962/J20882033.V30I3.5509","DOIUrl":null,"url":null,"abstract":"The quality is one of the important factors in the success of construction project. In fact, cost of construction is vain until 6-15% because reworking and process of work is late. Wika Building Contractor have standart of quality, name is QPASS ( Quality Performance Assessment Support System ) for all projects. Puncak CBD Surabaya Apartment,is one of Wika Building Project that having lower quality standart value in 2018. In this study, the six sigma method with the DMAIC (Define, Measure, Analyze, Improve, Control) approach was used to improve low quality values. Starting with identify works with defect largest based on QPASS monthly report, then calculate the dominant defect using a level of sigma. The research results show the wall work having highest total number of defects. The wall work defect with sigma value under 3 level are joint of wall is not perpendicular, cracked plaster seen from 1.5 m distance and flaking paint. At the improve phase, determined the best action plan for handle cause factor of the three such defect. The best action was determined are do thickening and adjust the angle of wall for defect “Joint of wall is not perpendicular”, giving direction for workers about correct plaster mixture for defect “Cracked plaster seen from 1.5 m distance”, and cleaning of wall before painting for defect “ Flaking paint”.","PeriodicalId":14549,"journal":{"name":"IPTEK: The Journal for Technology and Science","volume":"19 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-09-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Quality Improvement of Finishing Work in The Development of Puncak CBD Surabaya Apartment\",\"authors\":\"Safira Damayanti, I. Wiguna\",\"doi\":\"10.12962/J20882033.V30I3.5509\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The quality is one of the important factors in the success of construction project. In fact, cost of construction is vain until 6-15% because reworking and process of work is late. Wika Building Contractor have standart of quality, name is QPASS ( Quality Performance Assessment Support System ) for all projects. Puncak CBD Surabaya Apartment,is one of Wika Building Project that having lower quality standart value in 2018. In this study, the six sigma method with the DMAIC (Define, Measure, Analyze, Improve, Control) approach was used to improve low quality values. Starting with identify works with defect largest based on QPASS monthly report, then calculate the dominant defect using a level of sigma. The research results show the wall work having highest total number of defects. The wall work defect with sigma value under 3 level are joint of wall is not perpendicular, cracked plaster seen from 1.5 m distance and flaking paint. At the improve phase, determined the best action plan for handle cause factor of the three such defect. The best action was determined are do thickening and adjust the angle of wall for defect “Joint of wall is not perpendicular”, giving direction for workers about correct plaster mixture for defect “Cracked plaster seen from 1.5 m distance”, and cleaning of wall before painting for defect “ Flaking paint”.\",\"PeriodicalId\":14549,\"journal\":{\"name\":\"IPTEK: The Journal for Technology and Science\",\"volume\":\"19 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IPTEK: The Journal for Technology and Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12962/J20882033.V30I3.5509\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IPTEK: The Journal for Technology and Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12962/J20882033.V30I3.5509","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

质量是建设项目成功与否的重要因素之一。事实上,由于返工和工序较晚,施工成本在6-15%之前是徒劳的。威卡建筑承包商对所有项目都有质量标准,即QPASS(质量绩效评估支持系统)。punak CBD泗水公寓是威卡2018年质量标准价值较低的建筑项目之一。在本研究中,采用六西格玛方法和DMAIC(定义、测量、分析、改进、控制)方法来改善低质量值。首先根据QPASS月度报告确定缺陷最大的工作,然后使用西格玛水平计算主要缺陷。研究结果表明,墙体工程缺陷总数最高。σ值在3级以下的墙面工程缺陷为墙面接缝不垂直、1.5 m处可见灰泥开裂、油漆剥落。在改进阶段,确定了处理这三个缺陷原因的最佳行动计划。对“墙面接缝不垂直”的缺陷进行加厚和调整墙面角度,对“1.5 m处可见墙面开裂”的缺陷指导工人正确的抹灰配比,对“油漆剥落”的缺陷进行涂前清洗。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of Quality Improvement of Finishing Work in The Development of Puncak CBD Surabaya Apartment
The quality is one of the important factors in the success of construction project. In fact, cost of construction is vain until 6-15% because reworking and process of work is late. Wika Building Contractor have standart of quality, name is QPASS ( Quality Performance Assessment Support System ) for all projects. Puncak CBD Surabaya Apartment,is one of Wika Building Project that having lower quality standart value in 2018. In this study, the six sigma method with the DMAIC (Define, Measure, Analyze, Improve, Control) approach was used to improve low quality values. Starting with identify works with defect largest based on QPASS monthly report, then calculate the dominant defect using a level of sigma. The research results show the wall work having highest total number of defects. The wall work defect with sigma value under 3 level are joint of wall is not perpendicular, cracked plaster seen from 1.5 m distance and flaking paint. At the improve phase, determined the best action plan for handle cause factor of the three such defect. The best action was determined are do thickening and adjust the angle of wall for defect “Joint of wall is not perpendicular”, giving direction for workers about correct plaster mixture for defect “Cracked plaster seen from 1.5 m distance”, and cleaning of wall before painting for defect “ Flaking paint”.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
17
审稿时长
9 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信