社区对日惹至三宝垄铁路可行性的响应,通过麦哲朗重新激活计划

Amalia Khusnaya, A. T. Sulistiyani, T. D. Anggalini
{"title":"社区对日惹至三宝垄铁路可行性的响应,通过麦哲朗重新激活计划","authors":"Amalia Khusnaya, A. T. Sulistiyani, T. D. Anggalini","doi":"10.21831/jnp.v9i1.37138","DOIUrl":null,"url":null,"abstract":"This study aims to assess the feasibility of the Jogjakarta-Semarang railroad reactivation program via Magelang. The research method used is a quantitative method through surveys and qualitative methods using interview techniques. Feasibility is assessed from 4 aspects, namely aspects of need, technical, management and law, and social aspects. The survey results were processed using Microsoft Excel 2010 applications. Qualitative analysis was strengthened by data triangulation techniques. The findings of this study indicate that the Jogjakarta-Semarang railroad reactivation program via Magelang is feasible in two aspects, needs and management and law. While it is considered not feasible according to technical and social aspects. However, reactivation programs should continue to be carried out because future regional developments require alternative modes of transportation. To overcome this, researchers recommend a middle ground, namely 1) Partial reactivation; 2) Development of elevated lines; 3) Policy of swap with additional compensation. Generally, commuters responds positively to railroad reactivation programs, but if the railroad tracks hit a functional building that exists, then commuters have several considerations.","PeriodicalId":52795,"journal":{"name":"Jurnal Natapraja Kajian Ilmu Administrasi Negara","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"COMMUNITY RESPONSIVENESS TO THE FEASIBILITY OF THE YOGYAKARTA-SEMARANG RAILROAD VIA MAGELANG REACTIVATION PROGRAM\",\"authors\":\"Amalia Khusnaya, A. T. Sulistiyani, T. D. Anggalini\",\"doi\":\"10.21831/jnp.v9i1.37138\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aims to assess the feasibility of the Jogjakarta-Semarang railroad reactivation program via Magelang. The research method used is a quantitative method through surveys and qualitative methods using interview techniques. Feasibility is assessed from 4 aspects, namely aspects of need, technical, management and law, and social aspects. The survey results were processed using Microsoft Excel 2010 applications. Qualitative analysis was strengthened by data triangulation techniques. The findings of this study indicate that the Jogjakarta-Semarang railroad reactivation program via Magelang is feasible in two aspects, needs and management and law. While it is considered not feasible according to technical and social aspects. However, reactivation programs should continue to be carried out because future regional developments require alternative modes of transportation. To overcome this, researchers recommend a middle ground, namely 1) Partial reactivation; 2) Development of elevated lines; 3) Policy of swap with additional compensation. Generally, commuters responds positively to railroad reactivation programs, but if the railroad tracks hit a functional building that exists, then commuters have several considerations.\",\"PeriodicalId\":52795,\"journal\":{\"name\":\"Jurnal Natapraja Kajian Ilmu Administrasi Negara\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Natapraja Kajian Ilmu Administrasi Negara\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21831/jnp.v9i1.37138\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Natapraja Kajian Ilmu Administrasi Negara","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21831/jnp.v9i1.37138","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在评估经马格朗的雅加达至三宝垄铁路恢复计划的可行性。研究方法是通过调查的定量方法和使用访谈技术的定性方法。从需求、技术、管理和法律、社会四个方面进行可行性评估。调查结果使用Microsoft Excel 2010应用程序进行处理。通过数据三角测量技术加强定性分析。本研究结果表明,经马格朗的雅加达-三宝垄铁路复垦方案在需求和管理与法律两个方面是可行的。虽然从技术和社会方面来看,它被认为是不可行的。然而,应该继续进行重新激活计划,因为未来的区域发展需要替代的运输方式。为了克服这一点,研究人员建议采取中间立场,即1)部分再激活;2)高架线路的发展;3)附加补偿掉期政策。一般来说,通勤者对铁路重新激活计划的反应是积极的,但如果铁路轨道撞上了现有的功能性建筑,那么通勤者就有了一些考虑。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
COMMUNITY RESPONSIVENESS TO THE FEASIBILITY OF THE YOGYAKARTA-SEMARANG RAILROAD VIA MAGELANG REACTIVATION PROGRAM
This study aims to assess the feasibility of the Jogjakarta-Semarang railroad reactivation program via Magelang. The research method used is a quantitative method through surveys and qualitative methods using interview techniques. Feasibility is assessed from 4 aspects, namely aspects of need, technical, management and law, and social aspects. The survey results were processed using Microsoft Excel 2010 applications. Qualitative analysis was strengthened by data triangulation techniques. The findings of this study indicate that the Jogjakarta-Semarang railroad reactivation program via Magelang is feasible in two aspects, needs and management and law. While it is considered not feasible according to technical and social aspects. However, reactivation programs should continue to be carried out because future regional developments require alternative modes of transportation. To overcome this, researchers recommend a middle ground, namely 1) Partial reactivation; 2) Development of elevated lines; 3) Policy of swap with additional compensation. Generally, commuters responds positively to railroad reactivation programs, but if the railroad tracks hit a functional building that exists, then commuters have several considerations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
8 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信