基于DQFM方法的地震海啸事故序列分析方法的提出

H. Muta, K. Muramatsu
{"title":"基于DQFM方法的地震海啸事故序列分析方法的提出","authors":"H. Muta, K. Muramatsu","doi":"10.3327/TAESJ.J16.019","DOIUrl":null,"url":null,"abstract":"Since the Fukushima-Daiichi nuclear power station accident, the Japanese regulatory body has improved and upgraded the regulation of nuclear power plants, and continuous effort is required to enhance risk management in the midto long term. Earthquakes and tsunamis are considered as the most important risks, and the establishment of probabilistic risk assessment (PRA) methodologies for these events is a major issue of current PRA. The Nuclear Regulation Authority (NRA) addressed the PRA methodology for tsunamis induced by earthquakes, which is one of the methodologies that should be enhanced step by step for the improvement and maturity of PRA techniques. The AESJ standard for the procedure of seismic PRA for nuclear power plants in 2015 provides the basic concept of the methodology; however, details of the application to the actual plant PRA model have not been sufficiently provided. This study proposes a detailed PRA methodology for tsunamis induced by earthquakes using the DQFM methodology, which contributes to improving the safety of nuclear power plants. Furthermore, this study also states the issues which need more research.","PeriodicalId":8595,"journal":{"name":"Atomic Energy Society of Japan","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2017-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Proposal of Methodology of Tsunami Accident Sequence Analysis Induced by Earthquake Using DQFM Methodology\",\"authors\":\"H. Muta, K. Muramatsu\",\"doi\":\"10.3327/TAESJ.J16.019\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Since the Fukushima-Daiichi nuclear power station accident, the Japanese regulatory body has improved and upgraded the regulation of nuclear power plants, and continuous effort is required to enhance risk management in the midto long term. Earthquakes and tsunamis are considered as the most important risks, and the establishment of probabilistic risk assessment (PRA) methodologies for these events is a major issue of current PRA. The Nuclear Regulation Authority (NRA) addressed the PRA methodology for tsunamis induced by earthquakes, which is one of the methodologies that should be enhanced step by step for the improvement and maturity of PRA techniques. The AESJ standard for the procedure of seismic PRA for nuclear power plants in 2015 provides the basic concept of the methodology; however, details of the application to the actual plant PRA model have not been sufficiently provided. This study proposes a detailed PRA methodology for tsunamis induced by earthquakes using the DQFM methodology, which contributes to improving the safety of nuclear power plants. Furthermore, this study also states the issues which need more research.\",\"PeriodicalId\":8595,\"journal\":{\"name\":\"Atomic Energy Society of Japan\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Atomic Energy Society of Japan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3327/TAESJ.J16.019\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Atomic Energy Society of Japan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3327/TAESJ.J16.019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

自福岛第一核电站事故发生以来,日本监管机构对核电站的监管不断完善和升级,中长期风险管理需要不断加强。地震和海啸被认为是最重要的风险,建立这些事件的概率风险评估方法是当前概率风险评估的一个主要问题。核监管局(NRA)提出了地震诱发海啸的PRA方法,这是PRA技术不断完善和成熟所需要逐步加强的方法之一。2015年《核电厂地震PRA程序》AESJ标准提供了该方法的基本概念;然而,应用于实际工厂PRA模型的细节尚未充分提供。本研究提出了一种详细的基于DQFM方法的地震海啸PRA方法,有助于提高核电站的安全性。此外,本研究还指出了需要进一步研究的问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Proposal of Methodology of Tsunami Accident Sequence Analysis Induced by Earthquake Using DQFM Methodology
Since the Fukushima-Daiichi nuclear power station accident, the Japanese regulatory body has improved and upgraded the regulation of nuclear power plants, and continuous effort is required to enhance risk management in the midto long term. Earthquakes and tsunamis are considered as the most important risks, and the establishment of probabilistic risk assessment (PRA) methodologies for these events is a major issue of current PRA. The Nuclear Regulation Authority (NRA) addressed the PRA methodology for tsunamis induced by earthquakes, which is one of the methodologies that should be enhanced step by step for the improvement and maturity of PRA techniques. The AESJ standard for the procedure of seismic PRA for nuclear power plants in 2015 provides the basic concept of the methodology; however, details of the application to the actual plant PRA model have not been sufficiently provided. This study proposes a detailed PRA methodology for tsunamis induced by earthquakes using the DQFM methodology, which contributes to improving the safety of nuclear power plants. Furthermore, this study also states the issues which need more research.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信