Wolfgang Grenzfurtner, Martin Rudberg, Kristina Loike, R. Mayrhofer, M. Gronalt
{"title":"工业化住宅建筑企业战略与绩效管理体系设计","authors":"Wolfgang Grenzfurtner, Martin Rudberg, Kristina Loike, R. Mayrhofer, M. Gronalt","doi":"10.1080/09537287.2021.1992030","DOIUrl":null,"url":null,"abstract":"Abstract Performance management systems (PMS) are essential instruments for the evidence-based management of on-site production within the industrialized housebuilding (IHB) sector. The information required for more evidence-based decision-making is determined by the business strategies and should be reflected in the design of the PMS. The aim of this study is to clarify, report on and analyze the influence which different strategic orientations have on the PMS. For this purpose, a multiple case study was conducted within the IHB sector of Austria, Germany and Switzerland. The findings revealed those business strategies which led companies to develop specific features within their PMS and showed which specific indicators are relevant for managing on-site performance. In addition, the findings identify weaknesses in performance measurement but also best practice examples. Based on the findings, a differentiated approach towards the ongoing refinement of PMS is suggested, allowing management to be more focussed on strategic objectives.","PeriodicalId":20627,"journal":{"name":"Production Planning & Control","volume":"20 1","pages":"1178 - 1191"},"PeriodicalIF":6.1000,"publicationDate":"2023-09-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Industrialized housebuilding business strategies and the design of performance management systems\",\"authors\":\"Wolfgang Grenzfurtner, Martin Rudberg, Kristina Loike, R. Mayrhofer, M. Gronalt\",\"doi\":\"10.1080/09537287.2021.1992030\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Performance management systems (PMS) are essential instruments for the evidence-based management of on-site production within the industrialized housebuilding (IHB) sector. The information required for more evidence-based decision-making is determined by the business strategies and should be reflected in the design of the PMS. The aim of this study is to clarify, report on and analyze the influence which different strategic orientations have on the PMS. For this purpose, a multiple case study was conducted within the IHB sector of Austria, Germany and Switzerland. The findings revealed those business strategies which led companies to develop specific features within their PMS and showed which specific indicators are relevant for managing on-site performance. In addition, the findings identify weaknesses in performance measurement but also best practice examples. Based on the findings, a differentiated approach towards the ongoing refinement of PMS is suggested, allowing management to be more focussed on strategic objectives.\",\"PeriodicalId\":20627,\"journal\":{\"name\":\"Production Planning & Control\",\"volume\":\"20 1\",\"pages\":\"1178 - 1191\"},\"PeriodicalIF\":6.1000,\"publicationDate\":\"2023-09-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Production Planning & Control\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1080/09537287.2021.1992030\",\"RegionNum\":3,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Production Planning & Control","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/09537287.2021.1992030","RegionNum":3,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
Industrialized housebuilding business strategies and the design of performance management systems
Abstract Performance management systems (PMS) are essential instruments for the evidence-based management of on-site production within the industrialized housebuilding (IHB) sector. The information required for more evidence-based decision-making is determined by the business strategies and should be reflected in the design of the PMS. The aim of this study is to clarify, report on and analyze the influence which different strategic orientations have on the PMS. For this purpose, a multiple case study was conducted within the IHB sector of Austria, Germany and Switzerland. The findings revealed those business strategies which led companies to develop specific features within their PMS and showed which specific indicators are relevant for managing on-site performance. In addition, the findings identify weaknesses in performance measurement but also best practice examples. Based on the findings, a differentiated approach towards the ongoing refinement of PMS is suggested, allowing management to be more focussed on strategic objectives.
期刊介绍:
Production Planning & Control is an international journal that focuses on research papers concerning operations management across industries. It emphasizes research originating from industrial needs that can provide guidance to managers and future researchers. Papers accepted by "Production Planning & Control" should address emerging industrial needs, clearly outlining the nature of the industrial problem. Any suitable research methods may be employed, and each paper should justify the method used. Case studies illustrating international significance are encouraged. Authors are encouraged to relate their work to existing knowledge in the field, particularly regarding its implications for management practice and future research agendas.