{"title":"管理钢铁工业各生产阶段之间的相互依存关系","authors":"Sungwoo Byun","doi":"10.7880/abas.0201111a","DOIUrl":null,"url":null,"abstract":"Only a small portion out of –200 steel-makers in the world can produce high-grade steel such as hot-dip galvanized steel sheets and directional electrical steel sheets. For equipment-related industry such as steel industry, technical knowledge is embodied in their equipment; thus, technology transfer and catch-up are somewhat easy. However, for high-grade steel production, steel-makers in emerging countries equipped with large-scale capital investment and state-of-the-art equipment capital investment continued to struggle. The reason for this is when a new process is added to the existing process and not just the added process, the operational parameters of all processes must be coordinated. Thus, when a number of processes increases, it leads to a massive number of combinations of operational parameters to be coordinated, thus requiring time to acquire knowledge patterns. a) Faculty of Business Administration, Kindai University, 3-4-1 Kowakae, Higashiosaka-shi, Osaka Prefecture, Japan 577-0818, byun@bus.kindai.ac.jp A version of this paper was presented at the ABAS Conference 2020 Summer (Byun, 2020). © 2020 Sungwoo Byun. This is an Open Access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted reuse, distribution, and reproduction in any medium, provided the original work is properly cited. Annals of Business Administrative Science 19 (2020) 293–305 https://doi.org/10.7880/abas.0201111a Received: November 11, 2020; accepted: December 4, 2020 Published in advance on J-STAGE: December 11, 2020","PeriodicalId":52658,"journal":{"name":"Annals of Business Administrative Science","volume":"63 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Managing the interdependence among successive stages of production in steel industry\",\"authors\":\"Sungwoo Byun\",\"doi\":\"10.7880/abas.0201111a\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Only a small portion out of –200 steel-makers in the world can produce high-grade steel such as hot-dip galvanized steel sheets and directional electrical steel sheets. For equipment-related industry such as steel industry, technical knowledge is embodied in their equipment; thus, technology transfer and catch-up are somewhat easy. However, for high-grade steel production, steel-makers in emerging countries equipped with large-scale capital investment and state-of-the-art equipment capital investment continued to struggle. The reason for this is when a new process is added to the existing process and not just the added process, the operational parameters of all processes must be coordinated. Thus, when a number of processes increases, it leads to a massive number of combinations of operational parameters to be coordinated, thus requiring time to acquire knowledge patterns. a) Faculty of Business Administration, Kindai University, 3-4-1 Kowakae, Higashiosaka-shi, Osaka Prefecture, Japan 577-0818, byun@bus.kindai.ac.jp A version of this paper was presented at the ABAS Conference 2020 Summer (Byun, 2020). © 2020 Sungwoo Byun. This is an Open Access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted reuse, distribution, and reproduction in any medium, provided the original work is properly cited. Annals of Business Administrative Science 19 (2020) 293–305 https://doi.org/10.7880/abas.0201111a Received: November 11, 2020; accepted: December 4, 2020 Published in advance on J-STAGE: December 11, 2020\",\"PeriodicalId\":52658,\"journal\":{\"name\":\"Annals of Business Administrative Science\",\"volume\":\"63 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Annals of Business Administrative Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7880/abas.0201111a\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annals of Business Administrative Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7880/abas.0201111a","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

在全世界200多家钢铁企业中,能够生产热镀锌钢板、定向电工钢板等高档钢材的企业寥寥无几。对于装备相关的行业,如钢铁行业,技术知识体现在他们的装备中;因此,技术转让和追赶比较容易。然而,对于高品位的钢铁生产,拥有大规模资本投资和最先进设备资本投资的新兴国家的钢铁制造商仍在苦苦挣扎。其原因是,当向现有流程添加新流程时,而不仅仅是添加流程时,必须协调所有流程的操作参数。因此,当流程数量增加时,需要协调大量的操作参数组合,从而需要时间来获取知识模式。a)近代大学工商管理学院,3-4-1 Kowakae, Higashiosaka-shi,大阪府,日本577-0818,byun@bus.kindai.ac.jp本文的一个版本已在ABAS Conference 2020 Summer (byyun, 2020)上发表。©2020 Sungwoo Byun。这是一篇根据知识共享署名许可协议发布的开放获取文章,该协议允许在任何媒体上不受限制地重复使用、分发和复制,前提是正确引用原始作品。工商管理科学年鉴19 (2020)293-305 https://doi.org/10.7880/abas.0201111a收稿日期:2020年11月11日;J-STAGE提前发表:2020年12月11日
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Managing the interdependence among successive stages of production in steel industry
Only a small portion out of –200 steel-makers in the world can produce high-grade steel such as hot-dip galvanized steel sheets and directional electrical steel sheets. For equipment-related industry such as steel industry, technical knowledge is embodied in their equipment; thus, technology transfer and catch-up are somewhat easy. However, for high-grade steel production, steel-makers in emerging countries equipped with large-scale capital investment and state-of-the-art equipment capital investment continued to struggle. The reason for this is when a new process is added to the existing process and not just the added process, the operational parameters of all processes must be coordinated. Thus, when a number of processes increases, it leads to a massive number of combinations of operational parameters to be coordinated, thus requiring time to acquire knowledge patterns. a) Faculty of Business Administration, Kindai University, 3-4-1 Kowakae, Higashiosaka-shi, Osaka Prefecture, Japan 577-0818, byun@bus.kindai.ac.jp A version of this paper was presented at the ABAS Conference 2020 Summer (Byun, 2020). © 2020 Sungwoo Byun. This is an Open Access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted reuse, distribution, and reproduction in any medium, provided the original work is properly cited. Annals of Business Administrative Science 19 (2020) 293–305 https://doi.org/10.7880/abas.0201111a Received: November 11, 2020; accepted: December 4, 2020 Published in advance on J-STAGE: December 11, 2020
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
7
审稿时长
5 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信