{"title":"水力发电资产使用寿命延长框架","authors":"Arthur H. A. Melani, Miguel A. C. Michalski, R. F. da Silva, G. D. de Souza","doi":"10.1115/1.4055220","DOIUrl":null,"url":null,"abstract":"\n The integrity assessment of aged or worn out large electromechanical equipment unit, such as in hydroelectric generators, for possible life extension has been identified as a growing challenge in the electrical power generation industry worldwide. Although the available recommended practices provide a general assessment process, it is necessary to have more detailed guidelines. This can be achieved by adding relevant theories and models which can capture time-dependent equipment unit degradation more precisely. Seeking to fulfill this gap, this work aims to present a framework that combines several techniques of data analysis, reliability, and decision-making to support engineers, operators, and managers in the often-complex decision process, between whether or not to extend the time in service of an equipment or system, thus postponing the moment of a scheduled maintenance shutdown. To demonstrate the application of the proposed framework, a case study is presented considering simulated scenarios based on data and information from a real Hydroelectric Power Plant. The results show how the reliability of the components and the remaining useful life of those in fault can impact the decision-making regarding the in-service life extension of a system.","PeriodicalId":44694,"journal":{"name":"ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part B-Mechanical Engineering","volume":"10 1","pages":""},"PeriodicalIF":1.8000,"publicationDate":"2022-08-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Framework for In-Service Life Extension of Hydroelectric Generation Assets\",\"authors\":\"Arthur H. A. Melani, Miguel A. C. Michalski, R. F. da Silva, G. D. de Souza\",\"doi\":\"10.1115/1.4055220\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The integrity assessment of aged or worn out large electromechanical equipment unit, such as in hydroelectric generators, for possible life extension has been identified as a growing challenge in the electrical power generation industry worldwide. Although the available recommended practices provide a general assessment process, it is necessary to have more detailed guidelines. This can be achieved by adding relevant theories and models which can capture time-dependent equipment unit degradation more precisely. Seeking to fulfill this gap, this work aims to present a framework that combines several techniques of data analysis, reliability, and decision-making to support engineers, operators, and managers in the often-complex decision process, between whether or not to extend the time in service of an equipment or system, thus postponing the moment of a scheduled maintenance shutdown. To demonstrate the application of the proposed framework, a case study is presented considering simulated scenarios based on data and information from a real Hydroelectric Power Plant. The results show how the reliability of the components and the remaining useful life of those in fault can impact the decision-making regarding the in-service life extension of a system.\",\"PeriodicalId\":44694,\"journal\":{\"name\":\"ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part B-Mechanical Engineering\",\"volume\":\"10 1\",\"pages\":\"\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2022-08-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part B-Mechanical Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1115/1.4055220\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part B-Mechanical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/1.4055220","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

对老化或磨损的大型机电设备单元(如水力发电机)进行完整性评估,以延长其使用寿命,已成为全球发电行业面临的一个日益严峻的挑战。虽然现有的推荐实践提供了一般的评估过程,但有必要制定更详细的指导方针。这可以通过增加相关的理论和模型来实现,这些理论和模型可以更精确地捕获随时间变化的设备单元退化。为了填补这一空白,本工作旨在提出一个框架,该框架结合了多种数据分析、可靠性和决策技术,以支持工程师、操作人员和管理人员在通常复杂的决策过程中,在是否延长设备或系统的服务时间之间,从而推迟计划维护停机的时刻。为了演示所提出的框架的应用,给出了一个基于真实水电站数据和信息的模拟场景的案例研究。结果表明,故障部件的可靠性和故障部件的剩余使用寿命会影响系统延长使用寿命的决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Framework for In-Service Life Extension of Hydroelectric Generation Assets
The integrity assessment of aged or worn out large electromechanical equipment unit, such as in hydroelectric generators, for possible life extension has been identified as a growing challenge in the electrical power generation industry worldwide. Although the available recommended practices provide a general assessment process, it is necessary to have more detailed guidelines. This can be achieved by adding relevant theories and models which can capture time-dependent equipment unit degradation more precisely. Seeking to fulfill this gap, this work aims to present a framework that combines several techniques of data analysis, reliability, and decision-making to support engineers, operators, and managers in the often-complex decision process, between whether or not to extend the time in service of an equipment or system, thus postponing the moment of a scheduled maintenance shutdown. To demonstrate the application of the proposed framework, a case study is presented considering simulated scenarios based on data and information from a real Hydroelectric Power Plant. The results show how the reliability of the components and the remaining useful life of those in fault can impact the decision-making regarding the in-service life extension of a system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.20
自引率
13.60%
发文量
34
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信