项目运行状况检查报告在识别问题项目的指示性因素中的作用

H. K. Breesam, Hanan Abdul Munem Rajab
{"title":"项目运行状况检查报告在识别问题项目的指示性因素中的作用","authors":"H. K. Breesam, Hanan Abdul Munem Rajab","doi":"10.31026/j.eng.2023.08.05","DOIUrl":null,"url":null,"abstract":"Government-sponsored projects in Iraq significantly improve the economic situation and provide services but face high rates of troubling blocks. This work aims to identify indicative factors of the Troubled Project using periodic health check reports based on a literature review and interviews with Iraqi experts. As a result, a questionnaire was prepared that included four sections. The first is personal information; the second section is information about knowing the level of institutions’ implementation of project management through prepared documents. The third section is about indicative factors for the project's trouble, including 25 workers; the fourth section is about the questions in the periodic reports to check the project's health. Findings show that the following factors affect the troubled projects: inaccurate initial budget and schedule estimates; poor project scope description; poor team communication; poor planning and definition of the project; lack of a risk management plan and disregarding risk indicators; high rate of rework, and ineffective documentation of project plans with a high relative importance index that ranges from 0.91 to 0.81. Thus, the institutions' activation of the project examination reports with the proposed questions with a relative importance index ranging from 0.88 to 0.77 helps identify the main factors for the troubled projects.","PeriodicalId":52570,"journal":{"name":"Journal of Engineering Science","volume":"55 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Role of Project Health Check Reports in Identifying Indicative Factors of a Troubled Project\",\"authors\":\"H. K. Breesam, Hanan Abdul Munem Rajab\",\"doi\":\"10.31026/j.eng.2023.08.05\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Government-sponsored projects in Iraq significantly improve the economic situation and provide services but face high rates of troubling blocks. This work aims to identify indicative factors of the Troubled Project using periodic health check reports based on a literature review and interviews with Iraqi experts. As a result, a questionnaire was prepared that included four sections. The first is personal information; the second section is information about knowing the level of institutions’ implementation of project management through prepared documents. The third section is about indicative factors for the project's trouble, including 25 workers; the fourth section is about the questions in the periodic reports to check the project's health. Findings show that the following factors affect the troubled projects: inaccurate initial budget and schedule estimates; poor project scope description; poor team communication; poor planning and definition of the project; lack of a risk management plan and disregarding risk indicators; high rate of rework, and ineffective documentation of project plans with a high relative importance index that ranges from 0.91 to 0.81. Thus, the institutions' activation of the project examination reports with the proposed questions with a relative importance index ranging from 0.88 to 0.77 helps identify the main factors for the troubled projects.\",\"PeriodicalId\":52570,\"journal\":{\"name\":\"Journal of Engineering Science\",\"volume\":\"55 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31026/j.eng.2023.08.05\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31026/j.eng.2023.08.05","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

伊拉克政府资助的项目显著改善了经济状况,提供了服务,但面临着高比率的麻烦街区。这项工作的目的是根据文献审查和对伊拉克专家的访谈,利用定期健康检查报告确定问题项目的指示性因素。因此,编制了一份问卷,其中包括四个部分。首先是个人信息;第二部分是通过准备的文件了解机构项目管理实施水平的信息。第三部分是工程故障的指示因素,包括25名工人;第四部分是关于定期报告中检查项目健康状况的问题。研究结果表明,影响问题项目的因素有:初始预算和进度估计不准确;项目范围描述不完善;团队沟通不畅;项目规划和定义不佳;缺乏风险管理计划,忽视风险指标;高的返工率和无效的项目计划文档,相对重要性指数在0.91到0.81之间。因此,各机构激活的项目审查报告中提出的问题相对重要性指数在0.88 - 0.77之间,有助于识别问题项目的主要因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Role of Project Health Check Reports in Identifying Indicative Factors of a Troubled Project
Government-sponsored projects in Iraq significantly improve the economic situation and provide services but face high rates of troubling blocks. This work aims to identify indicative factors of the Troubled Project using periodic health check reports based on a literature review and interviews with Iraqi experts. As a result, a questionnaire was prepared that included four sections. The first is personal information; the second section is information about knowing the level of institutions’ implementation of project management through prepared documents. The third section is about indicative factors for the project's trouble, including 25 workers; the fourth section is about the questions in the periodic reports to check the project's health. Findings show that the following factors affect the troubled projects: inaccurate initial budget and schedule estimates; poor project scope description; poor team communication; poor planning and definition of the project; lack of a risk management plan and disregarding risk indicators; high rate of rework, and ineffective documentation of project plans with a high relative importance index that ranges from 0.91 to 0.81. Thus, the institutions' activation of the project examination reports with the proposed questions with a relative importance index ranging from 0.88 to 0.77 helps identify the main factors for the troubled projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
24
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信