{"title":"合同条件含糊不清导致迟延索赔责任方的认定过程","authors":"Chijoo Lee, Kwan, Taewook, Koh, Hoonsuk","doi":"10.5345/JKIBC.2020.20.6.527","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":17348,"journal":{"name":"Journal of the Korean Institute of Building Construction","volume":"192 12 1","pages":"527-535"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Process of Identifying the Responsibility Party of Caused Delay Claim by Ambiguity of the Conditions of the Contract\",\"authors\":\"Chijoo Lee, Kwan, Taewook, Koh, Hoonsuk\",\"doi\":\"10.5345/JKIBC.2020.20.6.527\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":17348,\"journal\":{\"name\":\"Journal of the Korean Institute of Building Construction\",\"volume\":\"192 12 1\",\"pages\":\"527-535\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Korean Institute of Building Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5345/JKIBC.2020.20.6.527\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Korean Institute of Building Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5345/JKIBC.2020.20.6.527","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}