{"title":"光伏系统模型验证和性能测试:项目开发商和技术供应商必须做些什么来支持能源生产估算","authors":"E. Riley","doi":"10.1109/PVSC.2012.6318226","DOIUrl":null,"url":null,"abstract":"This paper explores methods with which developers and technology providers can fully monetize energy production estimates of photovoltaic plants, thereby leaving little value on the table. The methods discussed in this paper describe comprehensive model validation and performance testing. Risk allocation through commercial means is also briefly discussed.","PeriodicalId":6318,"journal":{"name":"2012 38th IEEE Photovoltaic Specialists Conference","volume":"48 1","pages":"003053-003055"},"PeriodicalIF":0.0000,"publicationDate":"2012-06-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Photovoltaic system model validation and performance testing: What project developers and technology providers must do to support energy production estimates\",\"authors\":\"E. Riley\",\"doi\":\"10.1109/PVSC.2012.6318226\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper explores methods with which developers and technology providers can fully monetize energy production estimates of photovoltaic plants, thereby leaving little value on the table. The methods discussed in this paper describe comprehensive model validation and performance testing. Risk allocation through commercial means is also briefly discussed.\",\"PeriodicalId\":6318,\"journal\":{\"name\":\"2012 38th IEEE Photovoltaic Specialists Conference\",\"volume\":\"48 1\",\"pages\":\"003053-003055\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-06-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 38th IEEE Photovoltaic Specialists Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PVSC.2012.6318226\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 38th IEEE Photovoltaic Specialists Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PVSC.2012.6318226","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Photovoltaic system model validation and performance testing: What project developers and technology providers must do to support energy production estimates
This paper explores methods with which developers and technology providers can fully monetize energy production estimates of photovoltaic plants, thereby leaving little value on the table. The methods discussed in this paper describe comprehensive model validation and performance testing. Risk allocation through commercial means is also briefly discussed.