{"title":"雅加达市混合用途建筑项目施工工作范围管理分析","authors":"N. Hidayat, M. A. Simanjuntak","doi":"10.55324/josr.v2i9.1388","DOIUrl":null,"url":null,"abstract":"Planning the process of activities and work items in detail on the project is very important in construction work because it can affect the process of implementing project activities which starts from the bidding stage of a project. In this case, the construction service provider involved in a project is required to understand how the contents and conditions have been included in a construction project work contract so that they can identify the total number of construction work activities according to the scope of work. In this stud,y the method of analysis was used by taking references from several previous studies related to the management of the scope of construction work. Apart from the literature, data collection and interviews were also carried out with service providers, namely the main contractor for the ABC building construction project in the city of Jakarta. By using knowledge and experience for the implementation of project management, in terms of how the contractor can carry out the process of preparing the scope of construction work in detail. Therefore, information on the results of processed data from respondents who were directly involved in the implementation process of the ABC Building project was also obtained regarding the factors and variables that influence the drafting process to control the scope of construction work to help improve project completion performance. In this case, it produces data that it is known that there are 6 variables that have a strong influence on the preparation of the scope of construction work for the ABC Building project.","PeriodicalId":38172,"journal":{"name":"Journal of Social Research and Policy","volume":"115 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-08-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Scope Management Analysis of Construction Work for Mix-Used Building Projects in the City of Jakarta\",\"authors\":\"N. Hidayat, M. A. Simanjuntak\",\"doi\":\"10.55324/josr.v2i9.1388\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Planning the process of activities and work items in detail on the project is very important in construction work because it can affect the process of implementing project activities which starts from the bidding stage of a project. In this case, the construction service provider involved in a project is required to understand how the contents and conditions have been included in a construction project work contract so that they can identify the total number of construction work activities according to the scope of work. In this stud,y the method of analysis was used by taking references from several previous studies related to the management of the scope of construction work. Apart from the literature, data collection and interviews were also carried out with service providers, namely the main contractor for the ABC building construction project in the city of Jakarta. By using knowledge and experience for the implementation of project management, in terms of how the contractor can carry out the process of preparing the scope of construction work in detail. Therefore, information on the results of processed data from respondents who were directly involved in the implementation process of the ABC Building project was also obtained regarding the factors and variables that influence the drafting process to control the scope of construction work to help improve project completion performance. In this case, it produces data that it is known that there are 6 variables that have a strong influence on the preparation of the scope of construction work for the ABC Building project.\",\"PeriodicalId\":38172,\"journal\":{\"name\":\"Journal of Social Research and Policy\",\"volume\":\"115 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Social Research and Policy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55324/josr.v2i9.1388\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Social Research and Policy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55324/josr.v2i9.1388","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 0

摘要

详细规划项目的活动过程和工作项目在建设工作中是非常重要的,因为它会影响从项目招标阶段开始的项目活动的实施过程。在这种情况下,工程项目的施工服务提供者需要了解建设项目工作合同中如何包含内容和条件,以便根据工作范围确定施工工作活动的总数。在本研究中,采用了分析的方法,并参考了以往几项与建筑工程范围管理相关的研究。除了文献之外,还对服务提供商进行了数据收集和访谈,即雅加达市ABC大楼建设项目的主承包商。通过运用知识和经验进行项目管理的实施,承包商可以在如何进行施工的过程中详细准备施工范围的工作。因此,通过直接参与ABC建筑项目实施过程的受访者的数据处理结果,也获得了影响起草过程的因素和变量,以控制施工工作范围,帮助提高项目完成绩效。在这种情况下,它产生的数据是已知的,有6个变量对ABC建筑项目的施工工作范围的准备有很大的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Scope Management Analysis of Construction Work for Mix-Used Building Projects in the City of Jakarta
Planning the process of activities and work items in detail on the project is very important in construction work because it can affect the process of implementing project activities which starts from the bidding stage of a project. In this case, the construction service provider involved in a project is required to understand how the contents and conditions have been included in a construction project work contract so that they can identify the total number of construction work activities according to the scope of work. In this stud,y the method of analysis was used by taking references from several previous studies related to the management of the scope of construction work. Apart from the literature, data collection and interviews were also carried out with service providers, namely the main contractor for the ABC building construction project in the city of Jakarta. By using knowledge and experience for the implementation of project management, in terms of how the contractor can carry out the process of preparing the scope of construction work in detail. Therefore, information on the results of processed data from respondents who were directly involved in the implementation process of the ABC Building project was also obtained regarding the factors and variables that influence the drafting process to control the scope of construction work to help improve project completion performance. In this case, it produces data that it is known that there are 6 variables that have a strong influence on the preparation of the scope of construction work for the ABC Building project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Social Research and Policy
Journal of Social Research and Policy Social Sciences-Sociology and Political Science
CiteScore
0.30
自引率
0.00%
发文量
0
审稿时长
8 weeks
期刊介绍: Welfare states have made well-being one of the main focuses of public policies. Social policies entail, however, complicated, and sometimes almost insurmountable, issues of prioritization, measurement, problem evaluation or strategic and technical decision making concerning aim-setting or finding the most adequate means to ends. Given the pressures to effectiveness it is no wonder that the last several decades have witnessed the imposition of research-based social policies as standard as well as the development of policy-oriented research methodologies. Legitimate social policies are, in this context, more and more dependent on the accurate use of diagnostic methods, of sophisticated program evaluation approaches, of benchmarking and so on. Inspired by this acute interest, our journal aims to host primarily articles based on policy research and methodological approaches of policy topics. Our journal is open to sociologically informed contributions from anthropologists, psychologists, statisticians, economists, historians and political scientists. General theoretical papers are also welcomed if do not deviate from the interests stated above. The editors also welcome reviews of books that are relevant to the topics covered in the journal.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信