{"title":"规划在JL上3臂交叉路口的交通信号。伊玛目Bonjol - JL。阿卜杜勒·拉赫曼·萨利赫的切割手","authors":"H. Azwansyah","doi":"10.26418/ELKHA.V9I2.22731","DOIUrl":null,"url":null,"abstract":"Abstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 3 phase with cycle time 160 second. Green time of actual for phase 1 (Street of Jl. Imam Bonjol (a)) equal to 66 second, for phase 2 (Street of Jl. Imam Bonjol (b)) equal to 63 second, and for phase 3 (Street of Abdul Rahman Saleh) equal to 10 second. Keywords- Traffic Light, Cycle Time, Green Time","PeriodicalId":32754,"journal":{"name":"Elkha Jurnal Teknik Elektro","volume":"45 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak\",\"authors\":\"H. Azwansyah\",\"doi\":\"10.26418/ELKHA.V9I2.22731\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 3 phase with cycle time 160 second. Green time of actual for phase 1 (Street of Jl. Imam Bonjol (a)) equal to 66 second, for phase 2 (Street of Jl. Imam Bonjol (b)) equal to 63 second, and for phase 3 (Street of Abdul Rahman Saleh) equal to 10 second. Keywords- Traffic Light, Cycle Time, Green Time\",\"PeriodicalId\":32754,\"journal\":{\"name\":\"Elkha Jurnal Teknik Elektro\",\"volume\":\"45 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Elkha Jurnal Teknik Elektro\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26418/ELKHA.V9I2.22731\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Elkha Jurnal Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26418/ELKHA.V9I2.22731","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
摘要:本研究旨在规划Pontianak市Imam Bonjol街- Abdul Rahman Saleh街交叉口三支交通灯。本研究需要现场调查获得的交叉口几何数据和车辆交通数据。本文研究了循环时间为160秒的红绿灯三相规划。第一期实际开绿灯时间(jr街)伊玛目Bonjol (a))等于66秒,用于第2阶段(Jl街)。Imam Bonjol (b)等于63秒,第3阶段(Abdul Rahman Saleh街)等于10秒。关键词:交通灯,循环时间,绿灯时间
Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak
Abstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 3 phase with cycle time 160 second. Green time of actual for phase 1 (Street of Jl. Imam Bonjol (a)) equal to 66 second, for phase 2 (Street of Jl. Imam Bonjol (b)) equal to 63 second, and for phase 3 (Street of Abdul Rahman Saleh) equal to 10 second. Keywords- Traffic Light, Cycle Time, Green Time