{"title":"核电站退役过程中减少放射性混凝土废物的生物屏蔽拆除与处置策略","authors":"전철승, 김창락","doi":"10.7733/JNFCWT.2017.15.4.355","DOIUrl":null,"url":null,"abstract":"The decommissioning of Kori unit 1, which was permanently shut down in June of 2017, will be the first instance of the dismantling of a commercial nuclear power plant in Korea. The disposal of waste during the dismantling process accounts for a large part of the total decommissioning cost. Therefore, structures consisting of activated and contaminated concrete must be economically and safely dismantled by establishing a proper dismantling strategy. This study focuses on optimized dismantling and disposal scenarios pertaining to a biological shield. Several dismantling cases, regulations and technologies related to waste treatment as these practices pertain to nuclear power plants are analyzed. To minimize the amount of waste from the biological shield dismantling process, an optimized dismantling scenario is presented and disposal alternatives for dismantled concrete waste are proposed.","PeriodicalId":17456,"journal":{"name":"Journal of the Nuclear Fuel Cycle and Waste Technology","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2017-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"The Dismantling and Disposal Strategy of a Biological Shield for Minimization of Radioactive Concrete Waste During Decommissioning of a Nuclear Power Plant\",\"authors\":\"전철승, 김창락\",\"doi\":\"10.7733/JNFCWT.2017.15.4.355\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The decommissioning of Kori unit 1, which was permanently shut down in June of 2017, will be the first instance of the dismantling of a commercial nuclear power plant in Korea. The disposal of waste during the dismantling process accounts for a large part of the total decommissioning cost. Therefore, structures consisting of activated and contaminated concrete must be economically and safely dismantled by establishing a proper dismantling strategy. This study focuses on optimized dismantling and disposal scenarios pertaining to a biological shield. Several dismantling cases, regulations and technologies related to waste treatment as these practices pertain to nuclear power plants are analyzed. To minimize the amount of waste from the biological shield dismantling process, an optimized dismantling scenario is presented and disposal alternatives for dismantled concrete waste are proposed.\",\"PeriodicalId\":17456,\"journal\":{\"name\":\"Journal of the Nuclear Fuel Cycle and Waste Technology\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Nuclear Fuel Cycle and Waste Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7733/JNFCWT.2017.15.4.355\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Nuclear Fuel Cycle and Waste Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7733/JNFCWT.2017.15.4.355","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

2017年6月永久关闭的古里核电站1号机组的退役,将是国内第一个商用核电站的退役。拆解过程中的废弃物处理费用占拆解总费用的很大一部分。因此,由活化混凝土和污染混凝土组成的结构必须通过制定适当的拆除策略来经济安全地拆除。本研究的重点是优化拆除和处置方案有关的生物盾牌。分析了几个与核电站有关的拆除案例,以及与废物处理有关的法规和技术。为了最大限度地减少生物屏蔽拆除过程中产生的废物量,提出了一个优化的拆除方案,并提出了拆除混凝土废物的处理方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Dismantling and Disposal Strategy of a Biological Shield for Minimization of Radioactive Concrete Waste During Decommissioning of a Nuclear Power Plant
The decommissioning of Kori unit 1, which was permanently shut down in June of 2017, will be the first instance of the dismantling of a commercial nuclear power plant in Korea. The disposal of waste during the dismantling process accounts for a large part of the total decommissioning cost. Therefore, structures consisting of activated and contaminated concrete must be economically and safely dismantled by establishing a proper dismantling strategy. This study focuses on optimized dismantling and disposal scenarios pertaining to a biological shield. Several dismantling cases, regulations and technologies related to waste treatment as these practices pertain to nuclear power plants are analyzed. To minimize the amount of waste from the biological shield dismantling process, an optimized dismantling scenario is presented and disposal alternatives for dismantled concrete waste are proposed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信