{"title":"YS13井打捞作业经济可行性分析","authors":"Muhammad Ariyon, Bella Santika, Fitrianti","doi":"10.25299/jgeet.2022.7.4.10190","DOIUrl":null,"url":null,"abstract":"Oil consumption in Indonesia has increased from year to year. However, the increasing demand for oil and natural gas is inversely proportional to oil and gas production, which always declines from year to year. One of the factors causing the decline in production is the well damage. Well YS13 is a well that is damaged in the form of fish in the well. A fishing job is the most appropriate option to solve the problem of the presence of fish in the well because the fish in the well must be removed to continue well production activities or drilling activities. This study aimed to determine the economic feasibility of fishing job activities to be carried out at the YS13 well. The research begins with the preparation of the required data, then calculate the predicted production of the YS13 well with the decline curve method, estimates the cost of the fishing job, and economic fishing time (EFT). And determines the economic feasibility of the fishing job project by calculating profit indicators, namely Net Present Value (NPV), Internal Rate of Return (IRR), and Pay Out Time (POT). The results of calculations using the decline curve method obtained that the total production for 20 months is 4293.52 bbl. The EFT value is 3 days with Ps = 10% and the total cost of fishing is $28.657,70. The economic value of the project with discount rate = 12%, MARR = 12%, NPV = $147.367,20, IRR = 114%, and POT = 1.44. From the results of the calculation of the economic feasibility, the project is considered feasible to be carried out.","PeriodicalId":31931,"journal":{"name":"JGEET Journal of Geoscience Engineering Environment and Technology","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Economic Feasibility Analysis of Fishing Job Operation in Well YS13\",\"authors\":\"Muhammad Ariyon, Bella Santika, Fitrianti\",\"doi\":\"10.25299/jgeet.2022.7.4.10190\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Oil consumption in Indonesia has increased from year to year. However, the increasing demand for oil and natural gas is inversely proportional to oil and gas production, which always declines from year to year. One of the factors causing the decline in production is the well damage. Well YS13 is a well that is damaged in the form of fish in the well. A fishing job is the most appropriate option to solve the problem of the presence of fish in the well because the fish in the well must be removed to continue well production activities or drilling activities. This study aimed to determine the economic feasibility of fishing job activities to be carried out at the YS13 well. The research begins with the preparation of the required data, then calculate the predicted production of the YS13 well with the decline curve method, estimates the cost of the fishing job, and economic fishing time (EFT). And determines the economic feasibility of the fishing job project by calculating profit indicators, namely Net Present Value (NPV), Internal Rate of Return (IRR), and Pay Out Time (POT). The results of calculations using the decline curve method obtained that the total production for 20 months is 4293.52 bbl. The EFT value is 3 days with Ps = 10% and the total cost of fishing is $28.657,70. The economic value of the project with discount rate = 12%, MARR = 12%, NPV = $147.367,20, IRR = 114%, and POT = 1.44. From the results of the calculation of the economic feasibility, the project is considered feasible to be carried out.\",\"PeriodicalId\":31931,\"journal\":{\"name\":\"JGEET Journal of Geoscience Engineering Environment and Technology\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JGEET Journal of Geoscience Engineering Environment and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25299/jgeet.2022.7.4.10190\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JGEET Journal of Geoscience Engineering Environment and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25299/jgeet.2022.7.4.10190","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

印尼的石油消费量逐年增加。然而,对石油和天然气需求的增加与石油和天然气产量成反比,石油和天然气产量总是逐年下降。造成产量下降的因素之一是井损。YS13井是一口受损的井,井里有鱼。打捞作业是解决井中存在鱼的最合适的选择,因为必须清除井中的鱼才能继续进行油井生产或钻井活动。本研究旨在确定在YS13井进行打捞作业活动的经济可行性。研究从准备所需数据开始,然后使用递减曲线法计算YS13井的预测产量,估算打捞作业的成本和经济打捞时间(EFT)。并通过计算净现值(NPV)、内部收益率(IRR)和支付时间(POT)等利润指标来确定捕捞作业项目的经济可行性。采用递减曲线法计算,20个月的总产量为4293.52桶。EFT值为3天,Ps = 10%,捕捞总成本为28.657,70美元。项目的经济价值为贴现率为12%,MARR为12%,NPV为147.367美元,IRR为114%,POT为1.44。从经济可行性的计算结果来看,该项目是可行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Economic Feasibility Analysis of Fishing Job Operation in Well YS13
Oil consumption in Indonesia has increased from year to year. However, the increasing demand for oil and natural gas is inversely proportional to oil and gas production, which always declines from year to year. One of the factors causing the decline in production is the well damage. Well YS13 is a well that is damaged in the form of fish in the well. A fishing job is the most appropriate option to solve the problem of the presence of fish in the well because the fish in the well must be removed to continue well production activities or drilling activities. This study aimed to determine the economic feasibility of fishing job activities to be carried out at the YS13 well. The research begins with the preparation of the required data, then calculate the predicted production of the YS13 well with the decline curve method, estimates the cost of the fishing job, and economic fishing time (EFT). And determines the economic feasibility of the fishing job project by calculating profit indicators, namely Net Present Value (NPV), Internal Rate of Return (IRR), and Pay Out Time (POT). The results of calculations using the decline curve method obtained that the total production for 20 months is 4293.52 bbl. The EFT value is 3 days with Ps = 10% and the total cost of fishing is $28.657,70. The economic value of the project with discount rate = 12%, MARR = 12%, NPV = $147.367,20, IRR = 114%, and POT = 1.44. From the results of the calculation of the economic feasibility, the project is considered feasible to be carried out.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
6
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信