{"title":"商业商场屋顶太阳能光伏系统的技术经济学","authors":"Meshal M. Al-Shammari, E. Al-Ammar","doi":"10.1109/PECon48942.2020.9314427","DOIUrl":null,"url":null,"abstract":"In this paper, the feasibility of installing the PV systems on the rooftop of the shopping centers is investigated. Several case studies are proposed to cover a range of the rooftop area. Each case study contains two main options which include considering the load of the shopping center and exclude the load. The first case study aims to install a 2 MWp PV system according to the Saudi Arabia renewable energy regulation. The 2 MWp PV system is installed to be connected to the low voltage side. In this case study, the needed area to install the 2 MWp is 10,932 m2 which is less than the minimum range of the available area of the shopping mall (60,000 m2). The second case study aims to install the PV system to cover around 75% of the rooftop (60,000 m2). In addition, the feasible area to install the PV systems in the rooftop of the shopping centers are also investigated. Here, the area is found to be more than 8,430.8 m2 in case of the cost of the kWh is 0.07 SAR.","PeriodicalId":6768,"journal":{"name":"2020 IEEE International Conference on Power and Energy (PECon)","volume":"61 1","pages":"264-269"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Techno-Economics of Solar PV Systems on the Commercial Malls Rooftops\",\"authors\":\"Meshal M. Al-Shammari, E. Al-Ammar\",\"doi\":\"10.1109/PECon48942.2020.9314427\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, the feasibility of installing the PV systems on the rooftop of the shopping centers is investigated. Several case studies are proposed to cover a range of the rooftop area. Each case study contains two main options which include considering the load of the shopping center and exclude the load. The first case study aims to install a 2 MWp PV system according to the Saudi Arabia renewable energy regulation. The 2 MWp PV system is installed to be connected to the low voltage side. In this case study, the needed area to install the 2 MWp is 10,932 m2 which is less than the minimum range of the available area of the shopping mall (60,000 m2). The second case study aims to install the PV system to cover around 75% of the rooftop (60,000 m2). In addition, the feasible area to install the PV systems in the rooftop of the shopping centers are also investigated. Here, the area is found to be more than 8,430.8 m2 in case of the cost of the kWh is 0.07 SAR.\",\"PeriodicalId\":6768,\"journal\":{\"name\":\"2020 IEEE International Conference on Power and Energy (PECon)\",\"volume\":\"61 1\",\"pages\":\"264-269\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE International Conference on Power and Energy (PECon)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PECon48942.2020.9314427\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE International Conference on Power and Energy (PECon)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PECon48942.2020.9314427","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文研究了在购物中心屋顶安装光伏系统的可行性。提出了几个案例研究,以涵盖一系列的屋顶区域。每个案例研究包含两个主要选项,包括考虑购物中心的负荷和排除负荷。第一个案例研究的目标是根据沙特阿拉伯可再生能源法规安装一个2兆瓦的光伏系统。安装2mwp光伏系统,连接到低压侧。在本案例中,安装2mwp所需的面积为10,932 m2,小于商场可用面积的最小范围(60,000 m2)。第二个案例研究旨在安装光伏系统,覆盖约75%的屋顶(60,000平方米)。此外,还对购物中心屋顶安装光伏系统的可行面积进行了研究。在这里,在千瓦时成本为0.07 SAR的情况下,发现面积超过8,430.8 m2。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Techno-Economics of Solar PV Systems on the Commercial Malls Rooftops
In this paper, the feasibility of installing the PV systems on the rooftop of the shopping centers is investigated. Several case studies are proposed to cover a range of the rooftop area. Each case study contains two main options which include considering the load of the shopping center and exclude the load. The first case study aims to install a 2 MWp PV system according to the Saudi Arabia renewable energy regulation. The 2 MWp PV system is installed to be connected to the low voltage side. In this case study, the needed area to install the 2 MWp is 10,932 m2 which is less than the minimum range of the available area of the shopping mall (60,000 m2). The second case study aims to install the PV system to cover around 75% of the rooftop (60,000 m2). In addition, the feasible area to install the PV systems in the rooftop of the shopping centers are also investigated. Here, the area is found to be more than 8,430.8 m2 in case of the cost of the kWh is 0.07 SAR.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信