{"title":"一个完整的过程目标和持续审查系统,抽样检查","authors":"F. Tuffaha, M. Aldurgam","doi":"10.1177/1847979021999271","DOIUrl":null,"url":null,"abstract":"It is common in the integrated targeting inventory literature to assume 100% inspection. Yet, sampling inspection is still a valid alternative in numerous situations. Inspection time has been assumed negligible in the literature of integrated inventory and sampling inspection. Neglecting inspection time is unrealistic, especially when rejected lots are sent for 100% inspection. This research work integrates process targeting, production lot-sizing and inspection. Given a scenario of a producer and distributer, the objective is to determine the optimal mean setting at the producer, the production lot size to be produced and shipped to the distributor and the reorder point at the distributor under a given sampling inspection plan. To the best of the authors’ knowledge, sampling inspection and its associated costs are rarely addressed in integrated supply chain models, and have never been addressed in integrated models with controllable production rates. Numerical illustrations using an efficient solution technique are presented to highlight the impact of various model parameters. The results indicated that inspection time has a significant impact on the total cost of the developed model, especially, when tightened inspection plans are used.","PeriodicalId":45882,"journal":{"name":"International Journal of Engineering Business Management","volume":null,"pages":null},"PeriodicalIF":4.9000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"An integrated process targeting and continuous review system with sampling inspection\",\"authors\":\"F. Tuffaha, M. Aldurgam\",\"doi\":\"10.1177/1847979021999271\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"It is common in the integrated targeting inventory literature to assume 100% inspection. Yet, sampling inspection is still a valid alternative in numerous situations. Inspection time has been assumed negligible in the literature of integrated inventory and sampling inspection. Neglecting inspection time is unrealistic, especially when rejected lots are sent for 100% inspection. This research work integrates process targeting, production lot-sizing and inspection. Given a scenario of a producer and distributer, the objective is to determine the optimal mean setting at the producer, the production lot size to be produced and shipped to the distributor and the reorder point at the distributor under a given sampling inspection plan. To the best of the authors’ knowledge, sampling inspection and its associated costs are rarely addressed in integrated supply chain models, and have never been addressed in integrated models with controllable production rates. Numerical illustrations using an efficient solution technique are presented to highlight the impact of various model parameters. The results indicated that inspection time has a significant impact on the total cost of the developed model, especially, when tightened inspection plans are used.\",\"PeriodicalId\":45882,\"journal\":{\"name\":\"International Journal of Engineering Business Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":4.9000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Engineering Business Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1177/1847979021999271\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"BUSINESS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering Business Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1177/1847979021999271","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"BUSINESS","Score":null,"Total":0}
引用次数: 1

摘要

在综合目标库存文献中,假设100%检验是很常见的。然而,在许多情况下,抽样检查仍然是一种有效的选择。在综合盘存和抽样检验的文献中,检验时间被假定为可以忽略不计。忽略检验时间是不现实的,特别是当不合格批次被送去100%检验时。本研究工作集工艺确定、生产批量和检验为一体。给定一个生产商和分销商的场景,目标是在给定的抽样检查计划下,确定生产商的最佳平均设置,生产并运往分销商的生产批量以及分销商的再订货点。据作者所知,抽样检查及其相关成本很少在集成供应链模型中得到解决,并且从未在具有可控生产率的集成模型中得到解决。采用一种有效的求解技术给出了数值说明,以突出各种模型参数的影响。结果表明,检查时间对所开发模型的总成本有显著影响,特别是当使用收紧检查计划时。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An integrated process targeting and continuous review system with sampling inspection
It is common in the integrated targeting inventory literature to assume 100% inspection. Yet, sampling inspection is still a valid alternative in numerous situations. Inspection time has been assumed negligible in the literature of integrated inventory and sampling inspection. Neglecting inspection time is unrealistic, especially when rejected lots are sent for 100% inspection. This research work integrates process targeting, production lot-sizing and inspection. Given a scenario of a producer and distributer, the objective is to determine the optimal mean setting at the producer, the production lot size to be produced and shipped to the distributor and the reorder point at the distributor under a given sampling inspection plan. To the best of the authors’ knowledge, sampling inspection and its associated costs are rarely addressed in integrated supply chain models, and have never been addressed in integrated models with controllable production rates. Numerical illustrations using an efficient solution technique are presented to highlight the impact of various model parameters. The results indicated that inspection time has a significant impact on the total cost of the developed model, especially, when tightened inspection plans are used.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
7.50
自引率
6.10%
发文量
17
审稿时长
15 weeks
期刊介绍: The International Journal of Engineering Business Management (IJEBM) is an international, peer-reviewed, open access scientific journal that aims to promote an integrated and multidisciplinary approach to engineering, business and management. The journal focuses on issues related to the design, development and implementation of new methodologies and technologies that contribute to strategic and operational improvements of organizations within the contemporary global business environment. IJEBM encourages a systematic and holistic view in order to ensure an integrated and economically, socially and environmentally friendly approach to management of new technologies in business. It aims to be a world-class research platform for academics, managers, and professionals to publish scholarly research in the global arena. All submitted articles considered suitable for the International Journal of Engineering Business Management are subjected to rigorous peer review to ensure the highest levels of quality. The review process is carried out as quickly as possible to minimize any delays in the online publication of articles. Topics of interest include, but are not limited to: -Competitive product design and innovation -Operations and manufacturing strategy -Knowledge management and knowledge innovation -Information and decision support systems -Radio Frequency Identification -Wireless Sensor Networks -Industrial engineering for business improvement -Logistics engineering and transportation -Modeling and simulation of industrial and business systems -Quality management and Six Sigma -Automation of industrial processes and systems -Manufacturing performance and productivity measurement -Supply Chain Management and the virtual enterprise network -Environmental, legal and social aspects -Technology Capital and Financial Modelling -Engineering Economics and Investment Theory -Behavioural, Social and Political factors in Engineering
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信