{"title":"市区至荃湾","authors":"A. B. Beene, Chad Gartner","doi":"10.1061/ciegag.0001449","DOIUrl":null,"url":null,"abstract":"The new 27.2 mi long TEXRail commuter rail line facilitates travel between downtown Fort Worth, Texas, and the busy Dallas/Fort Worth International Airport. Challenges to be overcome during the project included working in and/or around existing rail stations and lines, myriad utilities, and airport facilities. Since beginning operations last year, the $1.034-billion project has substantially improved mobility in the Fort Worth metropolitan region.","PeriodicalId":50692,"journal":{"name":"Civil Engineering","volume":"12 1","pages":"58-63"},"PeriodicalIF":1.4000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Downtown To DFW\",\"authors\":\"A. B. Beene, Chad Gartner\",\"doi\":\"10.1061/ciegag.0001449\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The new 27.2 mi long TEXRail commuter rail line facilitates travel between downtown Fort Worth, Texas, and the busy Dallas/Fort Worth International Airport. Challenges to be overcome during the project included working in and/or around existing rail stations and lines, myriad utilities, and airport facilities. Since beginning operations last year, the $1.034-billion project has substantially improved mobility in the Fort Worth metropolitan region.\",\"PeriodicalId\":50692,\"journal\":{\"name\":\"Civil Engineering\",\"volume\":\"12 1\",\"pages\":\"58-63\"},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1061/ciegag.0001449\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1061/ciegag.0001449","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
The new 27.2 mi long TEXRail commuter rail line facilitates travel between downtown Fort Worth, Texas, and the busy Dallas/Fort Worth International Airport. Challenges to be overcome during the project included working in and/or around existing rail stations and lines, myriad utilities, and airport facilities. Since beginning operations last year, the $1.034-billion project has substantially improved mobility in the Fort Worth metropolitan region.
期刊介绍:
Reaching an audience of more than 140,000 civil engineers worldwide, the magazine has the largest circulation within the engineering profession, providing a compelling editorial mix of: -Projects- Trends- Engineering Science- Engineering Technology- Engineering History- In-Depth Analysis of Current Issues- Public Policy- Law- Ethics.