利用沉降柱数据研究泥沙粒径和密度的时间变化

A. Altaee, H. S. Samadiboroujeni, SA Naghshbandi
{"title":"利用沉降柱数据研究泥沙粒径和密度的时间变化","authors":"A. Altaee, H. S. Samadiboroujeni, SA Naghshbandi","doi":"10.19080/CERJ.2021.11.555812","DOIUrl":null,"url":null,"abstract":"The investigation of settling process and cohesive sediments consolidation in dam reservoirs and beaches is one of the most important issues playing an effective role in different descaling and sediment controlling designs, including dredging projects and hydraulic sediment removal operations. The superfine cohesive sediments even settle in the canals in which the existing standard criteria of design have been observed. They have also settled in dam reservoir and resulted in trapping efficiency near 100%. In addition to reducing the service life of reservoir, this problem has also changed the limpidity of the water released from the existing reservoir, ecology and morphology of the downstream river. In the beaches and seaports, the cohesive sediments settlement has caused an increase in dredging costs. In many cases it is impossible to overcome this phenomenon in practice [1].","PeriodicalId":30320,"journal":{"name":"Constructii Journal of Civil Engineering Research","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-02-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Time Variations of Sediment Floc Size and Density by using Settling Column Data\",\"authors\":\"A. Altaee, H. S. Samadiboroujeni, SA Naghshbandi\",\"doi\":\"10.19080/CERJ.2021.11.555812\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The investigation of settling process and cohesive sediments consolidation in dam reservoirs and beaches is one of the most important issues playing an effective role in different descaling and sediment controlling designs, including dredging projects and hydraulic sediment removal operations. The superfine cohesive sediments even settle in the canals in which the existing standard criteria of design have been observed. They have also settled in dam reservoir and resulted in trapping efficiency near 100%. In addition to reducing the service life of reservoir, this problem has also changed the limpidity of the water released from the existing reservoir, ecology and morphology of the downstream river. In the beaches and seaports, the cohesive sediments settlement has caused an increase in dredging costs. In many cases it is impossible to overcome this phenomenon in practice [1].\",\"PeriodicalId\":30320,\"journal\":{\"name\":\"Constructii Journal of Civil Engineering Research\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-02-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Constructii Journal of Civil Engineering Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.19080/CERJ.2021.11.555812\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Constructii Journal of Civil Engineering Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19080/CERJ.2021.11.555812","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

研究大坝、水库和滩涂的沉降过程和粘性沉积物固结是各种除垢和治沙设计(包括疏浚工程和水力清沙工程)中最重要的问题之一。超细粘性沉积物甚至在现有设计标准已被观察到的运河中沉淀。它们还在大坝水库中定居,捕集效率接近100%。这一问题除了降低水库的使用寿命外,还改变了现有水库放水的清澈度,改变了下游河流的生态和形态。在海滩和海港,粘性沉积物沉降导致疏浚成本增加。在许多情况下,这种现象在实践中是不可能克服的[1]。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Time Variations of Sediment Floc Size and Density by using Settling Column Data
The investigation of settling process and cohesive sediments consolidation in dam reservoirs and beaches is one of the most important issues playing an effective role in different descaling and sediment controlling designs, including dredging projects and hydraulic sediment removal operations. The superfine cohesive sediments even settle in the canals in which the existing standard criteria of design have been observed. They have also settled in dam reservoir and resulted in trapping efficiency near 100%. In addition to reducing the service life of reservoir, this problem has also changed the limpidity of the water released from the existing reservoir, ecology and morphology of the downstream river. In the beaches and seaports, the cohesive sediments settlement has caused an increase in dredging costs. In many cases it is impossible to overcome this phenomenon in practice [1].
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
4
审稿时长
16 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信