{"title":"分水墙施工中副坝坍塌事件及修复","authors":"Lingwei Zheng, Xin-yu Xie","doi":"10.1680/JGRIM.18.00035","DOIUrl":null,"url":null,"abstract":"The main problems faced with earth dams relate to leakage, landslides and cracking, which are in turn related to seepage under and through dams. The construction of the Huangbizhuang reservoir bega...","PeriodicalId":51705,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Ground Improvement","volume":"19 1","pages":""},"PeriodicalIF":1.3000,"publicationDate":"2019-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Collapse episodes and remediation of subsidiary dam under construction of cut-off walls\",\"authors\":\"Lingwei Zheng, Xin-yu Xie\",\"doi\":\"10.1680/JGRIM.18.00035\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The main problems faced with earth dams relate to leakage, landslides and cracking, which are in turn related to seepage under and through dams. The construction of the Huangbizhuang reservoir bega...\",\"PeriodicalId\":51705,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Ground Improvement\",\"volume\":\"19 1\",\"pages\":\"\"},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2019-04-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Ground Improvement\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/JGRIM.18.00035\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, GEOLOGICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Ground Improvement","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JGRIM.18.00035","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
Collapse episodes and remediation of subsidiary dam under construction of cut-off walls
The main problems faced with earth dams relate to leakage, landslides and cracking, which are in turn related to seepage under and through dams. The construction of the Huangbizhuang reservoir bega...
期刊介绍:
Ground Improvement provides a fast-track vehicle for the dissemination of news in technological developments, feasibility studies and innovative engineering applications for all aspects of ground improvement, ground reinforcement and grouting. The journal publishes high-quality, practical papers relevant to engineers, specialist contractors and academics involved in the development, design, construction, monitoring and quality control aspects of ground improvement. It covers a wide range of civil and environmental engineering applications, including analytical advances, performance evaluations, pilot and model studies, instrumented case-histories and innovative applications of existing technology.