A. Hasibuan, Andik Bintoro, S. Salahuddin, Rizka Dwi Meutia
{"title":"在上海PLN (persero) ulp站点,采用分段技术组合方法,在etap14.1.0上增加了负荷断开开关的可靠性分配系统","authors":"A. Hasibuan, Andik Bintoro, S. Salahuddin, Rizka Dwi Meutia","doi":"10.25077/aijaset.v2i2.42","DOIUrl":null,"url":null,"abstract":"PT. PLN (Persero) ULP Langsa city is one part of UP 3 langsa, the LS-05 feeder in section two is the location for placing several office buildings. Continuity stable distribution of electrical energy is one of the most important aspects in the distribution system. Based on these problems, the writer was inspired to consuct research with the aim of testing the reliability of the feeders LS-05 and LL-4 which was installed with LBS manuver motorized at both ends of feeders. The LS-05 feeder with section method SAIFI value is 2.2739 times/ customers/ year and SAIDI Value is 8.41995 hours/ customers/ year. For LL-4 feeder witsh the same method SAIFI value is 2.28905 times/ customers/ year, then using RIA-Section technique combined method, LS-05 feeder have SAIFI value is 2,0219 times/ customers/ year, SAIDI value is 8,3082 hours/ customers/ year, LL-4 feeder have SAIFI value is 2.6574 times/ customers/ year and SAIDI 9.3008 hours/ customers/ year. This value indicates thet these two methods have succeeded in showing a reliability index is in accordance with SPLN due to the addition of LBS motorized.","PeriodicalId":7884,"journal":{"name":"Andalasian International Journal of Applied Science, Engineering and Technology","volume":"18 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"RELIABILITY DISTRIBUTION SYSTEM ON LOAD BREAK SWITCH ADDITION AT PT. PLN (PERSERO) ULP LANGSA CITY USING RIA-SECTION TECHNIQUE COMBINED METHOD ON ETAP 14.1.0\",\"authors\":\"A. Hasibuan, Andik Bintoro, S. Salahuddin, Rizka Dwi Meutia\",\"doi\":\"10.25077/aijaset.v2i2.42\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT. PLN (Persero) ULP Langsa city is one part of UP 3 langsa, the LS-05 feeder in section two is the location for placing several office buildings. Continuity stable distribution of electrical energy is one of the most important aspects in the distribution system. Based on these problems, the writer was inspired to consuct research with the aim of testing the reliability of the feeders LS-05 and LL-4 which was installed with LBS manuver motorized at both ends of feeders. The LS-05 feeder with section method SAIFI value is 2.2739 times/ customers/ year and SAIDI Value is 8.41995 hours/ customers/ year. For LL-4 feeder witsh the same method SAIFI value is 2.28905 times/ customers/ year, then using RIA-Section technique combined method, LS-05 feeder have SAIFI value is 2,0219 times/ customers/ year, SAIDI value is 8,3082 hours/ customers/ year, LL-4 feeder have SAIFI value is 2.6574 times/ customers/ year and SAIDI 9.3008 hours/ customers/ year. This value indicates thet these two methods have succeeded in showing a reliability index is in accordance with SPLN due to the addition of LBS motorized.\",\"PeriodicalId\":7884,\"journal\":{\"name\":\"Andalasian International Journal of Applied Science, Engineering and Technology\",\"volume\":\"18 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Andalasian International Journal of Applied Science, Engineering and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25077/aijaset.v2i2.42\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Andalasian International Journal of Applied Science, Engineering and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25077/aijaset.v2i2.42","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
摘要
PT. PLN (Persero) ULP Langsa城市是UP 3 Langsa的一部分,第二段的LS-05支线是放置几座办公楼的位置。电能的连续稳定分配是配电系统的一个重要方面。基于这些问题,作者受到启发进行了研究,目的是测试LS-05和LL-4喂料机的可靠性,LS-05和LL-4喂料机两端安装了LBS机械手。采用分段法的LS-05馈线SAIFI值为2.2739次/顾客/年,SAIDI值为8.41995小时/顾客/年。采用相同方法的LL-4型给料机SAIFI值为2.28905次/顾客/年,采用RIA-Section技术结合方法得到LS-05型给料机SAIFI值为20219次/顾客/年,SAIDI值为83082小时/顾客/年,LL-4型给料机SAIFI值为2.6574次/顾客/年,SAIDI值为9.3008小时/顾客/年。该值表明,这两种方法已经成功地显示了可靠性指标是符合SPLN由于LBS的加入电动化。
RELIABILITY DISTRIBUTION SYSTEM ON LOAD BREAK SWITCH ADDITION AT PT. PLN (PERSERO) ULP LANGSA CITY USING RIA-SECTION TECHNIQUE COMBINED METHOD ON ETAP 14.1.0
PT. PLN (Persero) ULP Langsa city is one part of UP 3 langsa, the LS-05 feeder in section two is the location for placing several office buildings. Continuity stable distribution of electrical energy is one of the most important aspects in the distribution system. Based on these problems, the writer was inspired to consuct research with the aim of testing the reliability of the feeders LS-05 and LL-4 which was installed with LBS manuver motorized at both ends of feeders. The LS-05 feeder with section method SAIFI value is 2.2739 times/ customers/ year and SAIDI Value is 8.41995 hours/ customers/ year. For LL-4 feeder witsh the same method SAIFI value is 2.28905 times/ customers/ year, then using RIA-Section technique combined method, LS-05 feeder have SAIFI value is 2,0219 times/ customers/ year, SAIDI value is 8,3082 hours/ customers/ year, LL-4 feeder have SAIFI value is 2.6574 times/ customers/ year and SAIDI 9.3008 hours/ customers/ year. This value indicates thet these two methods have succeeded in showing a reliability index is in accordance with SPLN due to the addition of LBS motorized.