为国防机构的信息通信技术项目建立项目管理框架

Sean Filmalter, R. Steenkamp
{"title":"为国防机构的信息通信技术项目建立项目管理框架","authors":"Sean Filmalter, R. Steenkamp","doi":"10.5787/50-1-1333","DOIUrl":null,"url":null,"abstract":"A framework for information and communication technologies (ICT) projects may address the discord of traditional project management and that, which is required for ICT projects within defence institutions. The problem is also underlined by the pace of technological development and the current application of compromised project management. Globally no specific project management methodology is prominently suitable for solution delivery within defence institutions. The aim of this research was to address the problem by the development of a framework for the project management of ICT projects for defence institutions. The research methods used to address the problem were dual with respect to a descriptive study. Secondary sources were utilised to describe a thorough background to the problem and secondly, a descriptive case study was used. The ICT function of the South African Department of Defence (DOD) was used for the case study. A synthesis of the data from both these sources guided the development of a framework. The final outcome was the development and enlightenment of a conceptual framework for the project management of ICT projects after considering the unique challenges of the military, the importance of upscaling agility and by reviewing project management methodologies. In conclusion, the conceptual framework proposes a hypothetically workable approach for the project management of ICT projects in defence institutions.","PeriodicalId":53024,"journal":{"name":"Scientia Militaria","volume":"30 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Towards a project management framework for ICT projects in defence institutions\",\"authors\":\"Sean Filmalter, R. Steenkamp\",\"doi\":\"10.5787/50-1-1333\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A framework for information and communication technologies (ICT) projects may address the discord of traditional project management and that, which is required for ICT projects within defence institutions. The problem is also underlined by the pace of technological development and the current application of compromised project management. Globally no specific project management methodology is prominently suitable for solution delivery within defence institutions. The aim of this research was to address the problem by the development of a framework for the project management of ICT projects for defence institutions. The research methods used to address the problem were dual with respect to a descriptive study. Secondary sources were utilised to describe a thorough background to the problem and secondly, a descriptive case study was used. The ICT function of the South African Department of Defence (DOD) was used for the case study. A synthesis of the data from both these sources guided the development of a framework. The final outcome was the development and enlightenment of a conceptual framework for the project management of ICT projects after considering the unique challenges of the military, the importance of upscaling agility and by reviewing project management methodologies. In conclusion, the conceptual framework proposes a hypothetically workable approach for the project management of ICT projects in defence institutions.\",\"PeriodicalId\":53024,\"journal\":{\"name\":\"Scientia Militaria\",\"volume\":\"30 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientia Militaria\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5787/50-1-1333\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientia Militaria","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5787/50-1-1333","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

信息和通信技术(ICT)项目框架可以解决传统项目管理与国防机构内部ICT项目所需要的不协调。技术发展的速度和目前采用的折衷项目管理也突出了这个问题。在全球范围内,没有特定的项目管理方法特别适合国防机构的解决方案交付。这项研究的目的是通过制定国防机构ICT项目管理框架来解决这一问题。用于解决这个问题的研究方法是双重的,相对于描述性研究。二手资源被用来描述一个彻底的背景问题,其次,一个描述性的案例研究被使用。南非国防部的信通技术职能被用于案例研究。来自这两个来源的数据的综合指导了框架的开发。最后的结果是,在考虑到军事的独特挑战、提高敏捷性的重要性以及审查项目管理方法之后,开发和启发了ICT项目项目管理的概念框架。最后,概念框架为国防机构的信息和通信技术项目的项目管理提出了一个假设可行的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Towards a project management framework for ICT projects in defence institutions
A framework for information and communication technologies (ICT) projects may address the discord of traditional project management and that, which is required for ICT projects within defence institutions. The problem is also underlined by the pace of technological development and the current application of compromised project management. Globally no specific project management methodology is prominently suitable for solution delivery within defence institutions. The aim of this research was to address the problem by the development of a framework for the project management of ICT projects for defence institutions. The research methods used to address the problem were dual with respect to a descriptive study. Secondary sources were utilised to describe a thorough background to the problem and secondly, a descriptive case study was used. The ICT function of the South African Department of Defence (DOD) was used for the case study. A synthesis of the data from both these sources guided the development of a framework. The final outcome was the development and enlightenment of a conceptual framework for the project management of ICT projects after considering the unique challenges of the military, the importance of upscaling agility and by reviewing project management methodologies. In conclusion, the conceptual framework proposes a hypothetically workable approach for the project management of ICT projects in defence institutions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
37
审稿时长
6 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信