{"title":"铁路网与国家输电网的整合:66千伏Battipaglia - Gallico主干网用例","authors":"Alfonso De Cesare, A. Marchesin, C. Quaciari, Manuela Verdile, Filippo Fiorente","doi":"10.23919/AEIT50178.2020.9241116","DOIUrl":null,"url":null,"abstract":"In December 2015, Terna Rete Elettrica Nazionale S.p.A. (hereinafter Terna) acquired the high-voltage electricity infrastructures owned by the company Ferrovie dello Stato Italiane S.p.A. consolidating its role as leader among European TSOs with approximately 72.600 km of network managed. The portion of network acquired (hereinafter RETE asset) is now owned by the company RETE S.r.l. of the Terna group. At the same time, the goal achieved opened the doors to a new challenge for Terna: assessing the methods of integration of the RETE assets with the National Transmission Grid (NTG) in order to increase the reliability and safety of the national electricity service. The aim is to identify the best development solutions by obtaining greater interoperability between the two assets: this will allow to optimize the use of the electrical corridors with the consequent minimization of the impact of the high-voltage electricity infrastructures on the Italian territory. The purpose of this article is to identify the optimal integration method with the NTG of the 66 kV RETE asset of southern Italy through observations and results obtained from the various case studies.","PeriodicalId":6689,"journal":{"name":"2020 AEIT International Annual Conference (AEIT)","volume":"12 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Integration of railway network into the National Transmission Grid: use case on 66 kV Battipaglia – Gallico backbone\",\"authors\":\"Alfonso De Cesare, A. Marchesin, C. Quaciari, Manuela Verdile, Filippo Fiorente\",\"doi\":\"10.23919/AEIT50178.2020.9241116\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In December 2015, Terna Rete Elettrica Nazionale S.p.A. (hereinafter Terna) acquired the high-voltage electricity infrastructures owned by the company Ferrovie dello Stato Italiane S.p.A. consolidating its role as leader among European TSOs with approximately 72.600 km of network managed. The portion of network acquired (hereinafter RETE asset) is now owned by the company RETE S.r.l. of the Terna group. At the same time, the goal achieved opened the doors to a new challenge for Terna: assessing the methods of integration of the RETE assets with the National Transmission Grid (NTG) in order to increase the reliability and safety of the national electricity service. The aim is to identify the best development solutions by obtaining greater interoperability between the two assets: this will allow to optimize the use of the electrical corridors with the consequent minimization of the impact of the high-voltage electricity infrastructures on the Italian territory. The purpose of this article is to identify the optimal integration method with the NTG of the 66 kV RETE asset of southern Italy through observations and results obtained from the various case studies.\",\"PeriodicalId\":6689,\"journal\":{\"name\":\"2020 AEIT International Annual Conference (AEIT)\",\"volume\":\"12 1\",\"pages\":\"1-6\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 AEIT International Annual Conference (AEIT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23919/AEIT50178.2020.9241116\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 AEIT International Annual Conference (AEIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/AEIT50178.2020.9241116","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

2015年12月,Terna Rete electritica Nazionale S.p.A(以下简称Terna)收购了Ferrovie dello Stato Italiane S.p.A公司拥有的高压电力基础设施,巩固了其作为欧洲tso领导者的地位,管理着约72,600公里的网络。收购的部分网络(以下简称RETE资产)现归Terna集团的RETE S.r.l.公司所有。与此同时,这一目标的实现为Terna打开了一扇新的挑战之门:评估将RETE资产与国家输电网(NTG)整合的方法,以提高国家电力服务的可靠性和安全性。目的是通过在两个资产之间获得更大的互操作性来确定最佳的开发解决方案:这将允许优化电力走廊的使用,从而最大限度地减少高压电力基础设施对意大利领土的影响。本文的目的是通过观察和从各种案例研究中获得的结果,确定意大利南部66 kV RETE资产与NTG的最佳整合方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integration of railway network into the National Transmission Grid: use case on 66 kV Battipaglia – Gallico backbone
In December 2015, Terna Rete Elettrica Nazionale S.p.A. (hereinafter Terna) acquired the high-voltage electricity infrastructures owned by the company Ferrovie dello Stato Italiane S.p.A. consolidating its role as leader among European TSOs with approximately 72.600 km of network managed. The portion of network acquired (hereinafter RETE asset) is now owned by the company RETE S.r.l. of the Terna group. At the same time, the goal achieved opened the doors to a new challenge for Terna: assessing the methods of integration of the RETE assets with the National Transmission Grid (NTG) in order to increase the reliability and safety of the national electricity service. The aim is to identify the best development solutions by obtaining greater interoperability between the two assets: this will allow to optimize the use of the electrical corridors with the consequent minimization of the impact of the high-voltage electricity infrastructures on the Italian territory. The purpose of this article is to identify the optimal integration method with the NTG of the 66 kV RETE asset of southern Italy through observations and results obtained from the various case studies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信