实施精益生产实现低成本产品:以ABC公司为例

Jonny
{"title":"实施精益生产实现低成本产品:以ABC公司为例","authors":"Jonny","doi":"10.1109/IEEM50564.2021.9672815","DOIUrl":null,"url":null,"abstract":"In today's highly competitive industry, achieving highest Process Cycle Efficiency (PCE) is a must for any company to gain competitive advantage including ABC company. This company has implemented Lean Production throughout the company's manufacturing facilities. In this initiative, a research is conducted using Value Stream Mapping (VSM) to follow all processes used by producing product A as one of the company's line of products. Through this tool, waste was able to be carefully identified and eliminated to gain low-cost product. By doing this, PCE of the company experienced an 56% increase from 15.60% to 29.60% and 44% pricing index. Thus, the implementation of this initiative has given insight that low-cost product can also be gained by improving PCE.","PeriodicalId":6818,"journal":{"name":"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"29 1","pages":"729-733"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Implementation of Lean Production for Achieving Low-cost Product: A Case Study of ABC Company\",\"authors\":\"Jonny\",\"doi\":\"10.1109/IEEM50564.2021.9672815\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In today's highly competitive industry, achieving highest Process Cycle Efficiency (PCE) is a must for any company to gain competitive advantage including ABC company. This company has implemented Lean Production throughout the company's manufacturing facilities. In this initiative, a research is conducted using Value Stream Mapping (VSM) to follow all processes used by producing product A as one of the company's line of products. Through this tool, waste was able to be carefully identified and eliminated to gain low-cost product. By doing this, PCE of the company experienced an 56% increase from 15.60% to 29.60% and 44% pricing index. Thus, the implementation of this initiative has given insight that low-cost product can also be gained by improving PCE.\",\"PeriodicalId\":6818,\"journal\":{\"name\":\"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":\"29 1\",\"pages\":\"729-733\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM50564.2021.9672815\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM50564.2021.9672815","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在当今竞争激烈的行业中,实现最高的过程循环效率(PCE)是任何公司获得竞争优势的必要条件,包括ABC公司。这家公司在整个公司的生产设施中实施了精益生产。在这项倡议中,使用价值流映射(VSM)进行了一项研究,以跟踪生产产品a作为公司产品线之一所使用的所有过程。通过该工具,可以仔细识别和消除浪费,从而获得低成本的产品。通过这样做,公司的PCE从15.60%提高到29.60%,价格指数提高了56%。因此,这一举措的实施使人们认识到,通过改进PCE也可以获得低成本产品。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Implementation of Lean Production for Achieving Low-cost Product: A Case Study of ABC Company
In today's highly competitive industry, achieving highest Process Cycle Efficiency (PCE) is a must for any company to gain competitive advantage including ABC company. This company has implemented Lean Production throughout the company's manufacturing facilities. In this initiative, a research is conducted using Value Stream Mapping (VSM) to follow all processes used by producing product A as one of the company's line of products. Through this tool, waste was able to be carefully identified and eliminated to gain low-cost product. By doing this, PCE of the company experienced an 56% increase from 15.60% to 29.60% and 44% pricing index. Thus, the implementation of this initiative has given insight that low-cost product can also be gained by improving PCE.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信