上西部地区公共项目材料管理实践

Domini Naaemwan Aasonaa
{"title":"上西部地区公共项目材料管理实践","authors":"Domini Naaemwan Aasonaa","doi":"10.30880/jsmpm.2022.02.02.007","DOIUrl":null,"url":null,"abstract":"In project construction, materials constitute a major cost item of the project, making material management a key component of project success and profit maximization. Using a cross-sectional survey design, this study explored materials management practices on construction sites and the emerging challenges in material management in the Upper West Region of Ghana. A total of 129 respondents of project site managers, project consultants and the Districts/Municipals Engineers were involved in the study. The study found that organizations use buying strategies, material planning methods, transportation methods, material handling, and inventory management. Among the difficulties include theft and vandalism of materials, a lack of technical expertise on the contractor's part, and a shortage of storage space on site. Given the existing materials management practices, the paper argues for the adoption of technology-based material planning and handling methods. This requires capacity building on the adoption and use of technology in material management.","PeriodicalId":17134,"journal":{"name":"Journal of Sustainable Materials Processing and Management","volume":"52 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Materials Management Practices on Public Projects in the Upper West Region\",\"authors\":\"Domini Naaemwan Aasonaa\",\"doi\":\"10.30880/jsmpm.2022.02.02.007\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In project construction, materials constitute a major cost item of the project, making material management a key component of project success and profit maximization. Using a cross-sectional survey design, this study explored materials management practices on construction sites and the emerging challenges in material management in the Upper West Region of Ghana. A total of 129 respondents of project site managers, project consultants and the Districts/Municipals Engineers were involved in the study. The study found that organizations use buying strategies, material planning methods, transportation methods, material handling, and inventory management. Among the difficulties include theft and vandalism of materials, a lack of technical expertise on the contractor's part, and a shortage of storage space on site. Given the existing materials management practices, the paper argues for the adoption of technology-based material planning and handling methods. This requires capacity building on the adoption and use of technology in material management.\",\"PeriodicalId\":17134,\"journal\":{\"name\":\"Journal of Sustainable Materials Processing and Management\",\"volume\":\"52 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Sustainable Materials Processing and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30880/jsmpm.2022.02.02.007\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Sustainable Materials Processing and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30880/jsmpm.2022.02.02.007","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在项目建设中,材料是项目的主要成本项目,材料管理是项目成功和利润最大化的关键组成部分。采用横断面调查设计,本研究探讨了建筑工地的材料管理实践和加纳上西部地区材料管理的新挑战。共有129名受访者参与了这项研究,其中包括项目现场经理、项目顾问和地区/市政工程师。研究发现,组织使用购买策略、材料计划方法、运输方法、材料处理和库存管理。其中的困难包括盗窃和破坏材料,承包商缺乏技术专长,以及现场存储空间不足。鉴于现有的物料管理实践,本文主张采用基于技术的物料计划和处理方法。这就需要在物资管理中采用和使用技术方面进行能力建设。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Materials Management Practices on Public Projects in the Upper West Region
In project construction, materials constitute a major cost item of the project, making material management a key component of project success and profit maximization. Using a cross-sectional survey design, this study explored materials management practices on construction sites and the emerging challenges in material management in the Upper West Region of Ghana. A total of 129 respondents of project site managers, project consultants and the Districts/Municipals Engineers were involved in the study. The study found that organizations use buying strategies, material planning methods, transportation methods, material handling, and inventory management. Among the difficulties include theft and vandalism of materials, a lack of technical expertise on the contractor's part, and a shortage of storage space on site. Given the existing materials management practices, the paper argues for the adoption of technology-based material planning and handling methods. This requires capacity building on the adoption and use of technology in material management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信