{"title":"设计阶段桩基参数的有效性评价","authors":"G. Skibin, S. Chutchenko","doi":"10.29039/2308-0191-2022-10-4-6-10","DOIUrl":null,"url":null,"abstract":"The analysis and evaluation of the possibility of pile placement options, which took into account various combinations of foundation loading, was carried out on the example of the construction of a residential building, during the design and calculation of which there is a significant margin of safety of the most loaded pile and the difference in effort between the most and least loaded piles, as evidenced by the value of the average load per pile, which is almost two times less than the permissible value, indicate insufficient use of the bearing capacity of the pile as part of the foundation. As a result of the project adjustment, it was possible to reduce the number of piles and achieve significant cost savings of the SMR.","PeriodicalId":40951,"journal":{"name":"Russian Journal of Building Construction and Architecture","volume":"10 1","pages":""},"PeriodicalIF":0.1000,"publicationDate":"2022-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluation of the effectiveness of the parameters of pile foundations at the design stage\",\"authors\":\"G. Skibin, S. Chutchenko\",\"doi\":\"10.29039/2308-0191-2022-10-4-6-10\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The analysis and evaluation of the possibility of pile placement options, which took into account various combinations of foundation loading, was carried out on the example of the construction of a residential building, during the design and calculation of which there is a significant margin of safety of the most loaded pile and the difference in effort between the most and least loaded piles, as evidenced by the value of the average load per pile, which is almost two times less than the permissible value, indicate insufficient use of the bearing capacity of the pile as part of the foundation. As a result of the project adjustment, it was possible to reduce the number of piles and achieve significant cost savings of the SMR.\",\"PeriodicalId\":40951,\"journal\":{\"name\":\"Russian Journal of Building Construction and Architecture\",\"volume\":\"10 1\",\"pages\":\"\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2022-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Russian Journal of Building Construction and Architecture\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29039/2308-0191-2022-10-4-6-10\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Russian Journal of Building Construction and Architecture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29039/2308-0191-2022-10-4-6-10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

以某住宅楼为例,在设计计算过程中,最大荷载桩存在显著的安全裕度,最大荷载桩与最小荷载桩的努力差值,体现在每桩平均荷载值上,对考虑各种基础荷载组合的桩基布置方案的可能性进行了分析和评价。这几乎比允许值少了两倍,表明作为基础一部分的桩的承载能力没有得到充分的利用。由于项目调整,有可能减少桩的数量,并实现SMR的显著成本节约。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluation of the effectiveness of the parameters of pile foundations at the design stage
The analysis and evaluation of the possibility of pile placement options, which took into account various combinations of foundation loading, was carried out on the example of the construction of a residential building, during the design and calculation of which there is a significant margin of safety of the most loaded pile and the difference in effort between the most and least loaded piles, as evidenced by the value of the average load per pile, which is almost two times less than the permissible value, indicate insufficient use of the bearing capacity of the pile as part of the foundation. As a result of the project adjustment, it was possible to reduce the number of piles and achieve significant cost savings of the SMR.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Russian Journal of Building Construction and Architecture
Russian Journal of Building Construction and Architecture CONSTRUCTION & BUILDING TECHNOLOGY-
自引率
50.00%
发文量
28
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信