考虑斜坡率限制的赞比亚电网太阳能整合

B. Kumwenda, W. Mwaku, D. Mulongoti, H. Louie
{"title":"考虑斜坡率限制的赞比亚电网太阳能整合","authors":"B. Kumwenda, W. Mwaku, D. Mulongoti, H. Louie","doi":"10.1109/POWERAFRICA.2017.7991233","DOIUrl":null,"url":null,"abstract":"Zambia's national power grid is facing a constraint in meeting the present and expected future demand. Solar photovoltaic (PV) power is a promising option for large-scale renewable energy integration in Zambia as there is abundant insolation, averaging 5.5kWh/m2/day. However, large-scale integration of solar will increase the variability and uncertainty in the power supply, which can result in blackouts. This research investigates the maximum PV capacity that can be integrated into the existing Zambia grid while considering the ramp rate constraints of the existing generators. An optimal power flow using MATPOWER version 5.1 was performed using a transmission system model of the grid. The simulation used actual hourly load, generation and solar irradiance for a period of 1632 hours.","PeriodicalId":6601,"journal":{"name":"2017 IEEE PES PowerAfrica","volume":"38 1","pages":"254-259"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Integration of solar energy into the Zambia power grid considering ramp rate constraints\",\"authors\":\"B. Kumwenda, W. Mwaku, D. Mulongoti, H. Louie\",\"doi\":\"10.1109/POWERAFRICA.2017.7991233\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Zambia's national power grid is facing a constraint in meeting the present and expected future demand. Solar photovoltaic (PV) power is a promising option for large-scale renewable energy integration in Zambia as there is abundant insolation, averaging 5.5kWh/m2/day. However, large-scale integration of solar will increase the variability and uncertainty in the power supply, which can result in blackouts. This research investigates the maximum PV capacity that can be integrated into the existing Zambia grid while considering the ramp rate constraints of the existing generators. An optimal power flow using MATPOWER version 5.1 was performed using a transmission system model of the grid. The simulation used actual hourly load, generation and solar irradiance for a period of 1632 hours.\",\"PeriodicalId\":6601,\"journal\":{\"name\":\"2017 IEEE PES PowerAfrica\",\"volume\":\"38 1\",\"pages\":\"254-259\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE PES PowerAfrica\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/POWERAFRICA.2017.7991233\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE PES PowerAfrica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERAFRICA.2017.7991233","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

赞比亚的国家电网在满足当前和预期的未来需求方面面临着限制。太阳能光伏发电(PV)是赞比亚大规模可再生能源整合的一个有前途的选择,因为赞比亚的日照充足,平均5.5kWh/m2/天。然而,太阳能的大规模集成将增加电力供应的可变性和不确定性,这可能导致停电。本研究调查了在考虑现有发电机的斜坡率约束的情况下,可以集成到现有赞比亚电网的最大光伏容量。利用MATPOWER 5.1版本,利用电网的输电系统模型进行了最优潮流计算。模拟使用了1632小时的实际每小时负荷、发电量和太阳辐照度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integration of solar energy into the Zambia power grid considering ramp rate constraints
Zambia's national power grid is facing a constraint in meeting the present and expected future demand. Solar photovoltaic (PV) power is a promising option for large-scale renewable energy integration in Zambia as there is abundant insolation, averaging 5.5kWh/m2/day. However, large-scale integration of solar will increase the variability and uncertainty in the power supply, which can result in blackouts. This research investigates the maximum PV capacity that can be integrated into the existing Zambia grid while considering the ramp rate constraints of the existing generators. An optimal power flow using MATPOWER version 5.1 was performed using a transmission system model of the grid. The simulation used actual hourly load, generation and solar irradiance for a period of 1632 hours.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信