城市小流域雨水排水系统评价——以埃塞俄比亚奥罗米亚地区Shambu镇为例

Habtamu Dagne, Meseret Wagari Bortola
{"title":"城市小流域雨水排水系统评价——以埃塞俄比亚奥罗米亚地区Shambu镇为例","authors":"Habtamu Dagne, Meseret Wagari Bortola","doi":"10.7176/cer/12-9-01","DOIUrl":null,"url":null,"abstract":"Stormwater runoff in a small urban watershed is one of the major challenging issues facing many countries where financial capacity is very weak to provide sufficient drainage systems. This study aims to assess the stormwater drainage system in the small urban watershed as a case study of Shambu town, Oromia Region, Ethiopia. The main objective of this study was to assess whether this excess stormwater runoff is due to hydrological change or insufficient hydraulic design of the existing drainage system in the town. The existing drainage system in this small urban watershed was analyzed by statistical analysis and the main purpose of this was to know whether the designed drainage systems were sufficient hydraulically. The existing drainage system in this small urban watershed was analyzed by statistical analysis and the main purpose of this was to know whether the designed drainage systems were sufficient hydraulically. The existing design document was taken in this analysis and field analysis also made to check whether the drainage was constructed according to the specification. The area also analyzed hydrologically by delineating the watershed using ArcSWAT and the peak discharge was computed the outlet of the watershed using Rational method. Some data such runoff coefficient and manning’s values were also generated from the watershed based on the reality on the ground. The two results from hydrological and hydraulic models were compared and that of peak discharge obtained from rational method became greater than of the Peak discharge obtained from existing drainage measurement. Therefore, in this study it was concluded that since the watershed is steep in slope, it is contributing additional runoff to this small urban watershed, additional new 50% of the existing drainage system and rehabilitation works should be implemented to modify the draining capacity of the existing scheme. Additionally, managing and improper construction alignment problem in the existing system were identified, so to control this challenge periodic cleaning and modification of slope is recommended.","PeriodicalId":10219,"journal":{"name":"Civil and environmental research","volume":"27 3 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessment of Stormwater Drainage System for Small Urban Watershed: Case of Shambu Town, Oromia Region, Ethiopia\",\"authors\":\"Habtamu Dagne, Meseret Wagari Bortola\",\"doi\":\"10.7176/cer/12-9-01\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Stormwater runoff in a small urban watershed is one of the major challenging issues facing many countries where financial capacity is very weak to provide sufficient drainage systems. This study aims to assess the stormwater drainage system in the small urban watershed as a case study of Shambu town, Oromia Region, Ethiopia. The main objective of this study was to assess whether this excess stormwater runoff is due to hydrological change or insufficient hydraulic design of the existing drainage system in the town. The existing drainage system in this small urban watershed was analyzed by statistical analysis and the main purpose of this was to know whether the designed drainage systems were sufficient hydraulically. The existing drainage system in this small urban watershed was analyzed by statistical analysis and the main purpose of this was to know whether the designed drainage systems were sufficient hydraulically. The existing design document was taken in this analysis and field analysis also made to check whether the drainage was constructed according to the specification. The area also analyzed hydrologically by delineating the watershed using ArcSWAT and the peak discharge was computed the outlet of the watershed using Rational method. Some data such runoff coefficient and manning’s values were also generated from the watershed based on the reality on the ground. The two results from hydrological and hydraulic models were compared and that of peak discharge obtained from rational method became greater than of the Peak discharge obtained from existing drainage measurement. Therefore, in this study it was concluded that since the watershed is steep in slope, it is contributing additional runoff to this small urban watershed, additional new 50% of the existing drainage system and rehabilitation works should be implemented to modify the draining capacity of the existing scheme. Additionally, managing and improper construction alignment problem in the existing system were identified, so to control this challenge periodic cleaning and modification of slope is recommended.\",\"PeriodicalId\":10219,\"journal\":{\"name\":\"Civil and environmental research\",\"volume\":\"27 3 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Civil and environmental research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7176/cer/12-9-01\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Civil and environmental research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7176/cer/12-9-01","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

城市小流域的雨水径流是许多国家面临的主要挑战之一,这些国家的财政能力非常弱,无法提供足够的排水系统。本研究旨在以埃塞俄比亚奥罗米亚地区Shambu镇为例,对城市小流域的雨水排水系统进行评估。这项研究的主要目的是评估这种过量的雨水径流是由于水文变化还是由于城镇现有排水系统的水力设计不足。对该城市小流域现有的排水系统进行统计分析,主要目的是了解设计的排水系统在水力上是否足够。对该城市小流域现有的排水系统进行统计分析,主要目的是了解设计的排水系统在水力上是否足够。本次分析采用现有设计文件,并进行现场分析,检查排水是否按规范施工。利用ArcSWAT对流域进行了水文分析,并利用Rational方法计算了流域出水口的峰值流量。根据地面实际情况,从流域中生成径流系数、曼宁值等数据。比较了水工模型和水文模型的结果,发现合理方法得到的峰值流量大于现有排水测量得到的峰值流量。因此,在本研究中得出的结论是,由于流域坡度陡峭,它为这个小的城市流域贡献了额外的径流,因此应该实施额外的新50%的现有排水系统和修复工程,以修改现有方案的排水能力。此外,还发现了现有系统中的管理和不当施工路线问题,因此建议对边坡进行定期清理和改造。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessment of Stormwater Drainage System for Small Urban Watershed: Case of Shambu Town, Oromia Region, Ethiopia
Stormwater runoff in a small urban watershed is one of the major challenging issues facing many countries where financial capacity is very weak to provide sufficient drainage systems. This study aims to assess the stormwater drainage system in the small urban watershed as a case study of Shambu town, Oromia Region, Ethiopia. The main objective of this study was to assess whether this excess stormwater runoff is due to hydrological change or insufficient hydraulic design of the existing drainage system in the town. The existing drainage system in this small urban watershed was analyzed by statistical analysis and the main purpose of this was to know whether the designed drainage systems were sufficient hydraulically. The existing drainage system in this small urban watershed was analyzed by statistical analysis and the main purpose of this was to know whether the designed drainage systems were sufficient hydraulically. The existing design document was taken in this analysis and field analysis also made to check whether the drainage was constructed according to the specification. The area also analyzed hydrologically by delineating the watershed using ArcSWAT and the peak discharge was computed the outlet of the watershed using Rational method. Some data such runoff coefficient and manning’s values were also generated from the watershed based on the reality on the ground. The two results from hydrological and hydraulic models were compared and that of peak discharge obtained from rational method became greater than of the Peak discharge obtained from existing drainage measurement. Therefore, in this study it was concluded that since the watershed is steep in slope, it is contributing additional runoff to this small urban watershed, additional new 50% of the existing drainage system and rehabilitation works should be implemented to modify the draining capacity of the existing scheme. Additionally, managing and improper construction alignment problem in the existing system were identified, so to control this challenge periodic cleaning and modification of slope is recommended.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信