偏见如何影响项目经理不终止失败项目的决定

IF 0.4 Q4 MANAGEMENT
K. Strang, N. Vajjhala
{"title":"偏见如何影响项目经理不终止失败项目的决定","authors":"K. Strang, N. Vajjhala","doi":"10.4018/ijitpm.304059","DOIUrl":null,"url":null,"abstract":"Almost half of projects have failed globally during the last 50 years yet most studies in the literature review were inclusive. The research design was a robust repeated measures controlled experiment where the 16 participants received all treatments, which may be contrasted to a similar 4 x 4 factorial experiment with a control group (common in psychology or healthcare) resulting in a group size of only 4. All but the individual project manager (PM) factors were controlled, while primary demographic and behavior data were collected. PM’s were tested for competence using a risk management scenario, and given two manipulated conditions (a basic and a biased treatment). Since the organizational and project level factors were controlled, some individual level factors impacted the decision. PM’s with higher competence made better decisions, with a 22% effect size, when all other factors in the model were accounted for. Competent non-certified PM’s made better decisions as compared to certified incompetent PM’s.","PeriodicalId":43211,"journal":{"name":"International Journal of Information Technology Project Management","volume":"83 1","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"How Bias Impacted the Project Manager Decision to Not Terminate a Failing Project\",\"authors\":\"K. Strang, N. Vajjhala\",\"doi\":\"10.4018/ijitpm.304059\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Almost half of projects have failed globally during the last 50 years yet most studies in the literature review were inclusive. The research design was a robust repeated measures controlled experiment where the 16 participants received all treatments, which may be contrasted to a similar 4 x 4 factorial experiment with a control group (common in psychology or healthcare) resulting in a group size of only 4. All but the individual project manager (PM) factors were controlled, while primary demographic and behavior data were collected. PM’s were tested for competence using a risk management scenario, and given two manipulated conditions (a basic and a biased treatment). Since the organizational and project level factors were controlled, some individual level factors impacted the decision. PM’s with higher competence made better decisions, with a 22% effect size, when all other factors in the model were accounted for. Competent non-certified PM’s made better decisions as compared to certified incompetent PM’s.\",\"PeriodicalId\":43211,\"journal\":{\"name\":\"International Journal of Information Technology Project Management\",\"volume\":\"83 1\",\"pages\":\"\"},\"PeriodicalIF\":0.4000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Information Technology Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/ijitpm.304059\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Information Technology Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/ijitpm.304059","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

摘要

在过去的50年里,全球几乎有一半的项目失败了,但文献综述中的大多数研究都是包容性的。研究设计是一个强大的重复测量控制实验,其中16名参与者接受了所有治疗,这可能与对照组(常见的心理学或医疗保健)的类似4 x 4析因实验形成对比,导致组大小仅为4。除了单个项目经理(PM)因素外,所有因素都得到了控制,同时收集了主要的人口统计和行为数据。使用风险管理场景测试PM的能力,并给出两个操纵条件(基本和有偏见的处理)。由于控制了组织和项目层面的因素,一些个人层面的因素影响了决策。当考虑到模型中的所有其他因素时,具有较高能力的PM做出了更好的决策,其效应量为22%。有能力的非认证PM比有资格的不合格PM做出更好的决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
How Bias Impacted the Project Manager Decision to Not Terminate a Failing Project
Almost half of projects have failed globally during the last 50 years yet most studies in the literature review were inclusive. The research design was a robust repeated measures controlled experiment where the 16 participants received all treatments, which may be contrasted to a similar 4 x 4 factorial experiment with a control group (common in psychology or healthcare) resulting in a group size of only 4. All but the individual project manager (PM) factors were controlled, while primary demographic and behavior data were collected. PM’s were tested for competence using a risk management scenario, and given two manipulated conditions (a basic and a biased treatment). Since the organizational and project level factors were controlled, some individual level factors impacted the decision. PM’s with higher competence made better decisions, with a 22% effect size, when all other factors in the model were accounted for. Competent non-certified PM’s made better decisions as compared to certified incompetent PM’s.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.70
自引率
25.00%
发文量
20
期刊介绍: The mission of International Journal of Information Technology Project Management (IJITPM) is to provide a forum for practitioners and researchers from both public and private sectors of project management professionals, along with information systems researchers, software developers and vendors, to contribute and to circulate ground-breaking work, and to shape future directions for research, as well as to help project leaders and managers apply various advanced techniques in information systems. It encourages discussions on how the various information systems can improve project management as well as how advances in project management can affect the growth of information systems.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信