制造系统中异构多agv耦合任务调度问题的多决策点模型

IF 1.6 3区 工程技术 Q4 ENGINEERING, INDUSTRIAL
Xingkai Wang, Weimin Wu, Zichao Xing
{"title":"制造系统中异构多agv耦合任务调度问题的多决策点模型","authors":"Xingkai Wang, Weimin Wu, Zichao Xing","doi":"10.5267/j.ijiec.2022.10.003","DOIUrl":null,"url":null,"abstract":"Automated guided vehicle (AGV) is widely used in automated manufacturing systems as a material handling tool. Although the task scheduling problem with isomorphic AGV has remained a very active research field through the years, too little work has been devoted to the task scheduling problems with heterogeneous AGVs. A coupled task with heterogeneous AGVs is a complex task that needs the cooperation of more than one type of AGVs. In this paper, a manufacturing system with two types of AGVs and three types of tasks is studied. To solve the coupled task scheduling problem with heterogeneous AGVs in this manufacturing system, we introduce two new methods based on the established mathematical model, namely, the decoupled scheduling strategy and coupled scheduling strategy with multi-decision model. The decoupled scheduling strategy is widely used in coupled task scheduling problems. However, there are some situations that the decoupled scheduling strategy cannot solve the problem well. To overcome the problem, the multi-decision point model solves the coupled task scheduling problem without decomposition. In order to ensure the searching speed and searching accuracy, a novel hybrid heuristic algorithm based on simulated annealing algorithm and tabu search algorithm is developed. The simulation experiment results show the proposed coupled scheduling algorithm has priority in coupled task scheduling problems.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":"41 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Multi-decision points model to solve coupled-task scheduling problem with heterogeneous multi-AGV in manufacturing systems\",\"authors\":\"Xingkai Wang, Weimin Wu, Zichao Xing\",\"doi\":\"10.5267/j.ijiec.2022.10.003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Automated guided vehicle (AGV) is widely used in automated manufacturing systems as a material handling tool. Although the task scheduling problem with isomorphic AGV has remained a very active research field through the years, too little work has been devoted to the task scheduling problems with heterogeneous AGVs. A coupled task with heterogeneous AGVs is a complex task that needs the cooperation of more than one type of AGVs. In this paper, a manufacturing system with two types of AGVs and three types of tasks is studied. To solve the coupled task scheduling problem with heterogeneous AGVs in this manufacturing system, we introduce two new methods based on the established mathematical model, namely, the decoupled scheduling strategy and coupled scheduling strategy with multi-decision model. The decoupled scheduling strategy is widely used in coupled task scheduling problems. However, there are some situations that the decoupled scheduling strategy cannot solve the problem well. To overcome the problem, the multi-decision point model solves the coupled task scheduling problem without decomposition. In order to ensure the searching speed and searching accuracy, a novel hybrid heuristic algorithm based on simulated annealing algorithm and tabu search algorithm is developed. The simulation experiment results show the proposed coupled scheduling algorithm has priority in coupled task scheduling problems.\",\"PeriodicalId\":51356,\"journal\":{\"name\":\"International Journal of Industrial Engineering Computations\",\"volume\":\"41 1\",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial Engineering Computations\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5267/j.ijiec.2022.10.003\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2022.10.003","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 1

摘要

自动导引车(AGV)作为一种物料搬运工具广泛应用于自动化制造系统中。多年来,同构AGV任务调度问题一直是一个非常活跃的研究领域,但对异构AGV任务调度问题的研究却很少。具有异构agv的耦合任务是一种复杂的任务,需要一种以上类型的agv协同工作。本文研究了一个具有两种agv和三种任务的制造系统。为了解决该制造系统中异构agv的耦合任务调度问题,在建立数学模型的基础上,提出了解耦调度策略和多决策模型耦合调度策略。解耦调度策略广泛应用于耦合任务调度问题。然而,在某些情况下,解耦调度策略不能很好地解决这一问题。为了克服这一问题,多决策点模型解决了不分解的耦合任务调度问题。为了保证搜索速度和搜索精度,提出了一种基于模拟退火算法和禁忌搜索算法的混合启发式算法。仿真实验结果表明,所提出的耦合调度算法在耦合任务调度问题中具有优先级。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Multi-decision points model to solve coupled-task scheduling problem with heterogeneous multi-AGV in manufacturing systems
Automated guided vehicle (AGV) is widely used in automated manufacturing systems as a material handling tool. Although the task scheduling problem with isomorphic AGV has remained a very active research field through the years, too little work has been devoted to the task scheduling problems with heterogeneous AGVs. A coupled task with heterogeneous AGVs is a complex task that needs the cooperation of more than one type of AGVs. In this paper, a manufacturing system with two types of AGVs and three types of tasks is studied. To solve the coupled task scheduling problem with heterogeneous AGVs in this manufacturing system, we introduce two new methods based on the established mathematical model, namely, the decoupled scheduling strategy and coupled scheduling strategy with multi-decision model. The decoupled scheduling strategy is widely used in coupled task scheduling problems. However, there are some situations that the decoupled scheduling strategy cannot solve the problem well. To overcome the problem, the multi-decision point model solves the coupled task scheduling problem without decomposition. In order to ensure the searching speed and searching accuracy, a novel hybrid heuristic algorithm based on simulated annealing algorithm and tabu search algorithm is developed. The simulation experiment results show the proposed coupled scheduling algorithm has priority in coupled task scheduling problems.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.70
自引率
9.10%
发文量
35
审稿时长
20 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信