{"title":"用于减轻和监测企业资源规划项目中“偏差风险”的可操作的“风险因素驱动”方法","authors":"Sarra Mamoghli, Virginie Goepp, V. Botta-Genoulaz","doi":"10.1016/j.compind.2015.01.010","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":10628,"journal":{"name":"Comput. Ind.","volume":"17 1","pages":"1-12"},"PeriodicalIF":0.0000,"publicationDate":"2015-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"An operational \\\"Risk Factor Driven\\\" approach for the mitigation and monitoring of the \\\"Misalignment Risk\\\" in Enterprise Resource Planning projects\",\"authors\":\"Sarra Mamoghli, Virginie Goepp, V. Botta-Genoulaz\",\"doi\":\"10.1016/j.compind.2015.01.010\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":10628,\"journal\":{\"name\":\"Comput. Ind.\",\"volume\":\"17 1\",\"pages\":\"1-12\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Comput. Ind.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1016/j.compind.2015.01.010\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Comput. Ind.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1016/j.compind.2015.01.010","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}