解决特殊凝析气田全尺寸模型钻井效果核算问题

A. Poushev, R. R. Mangushev, S. Yakimov
{"title":"解决特殊凝析气田全尺寸模型钻井效果核算问题","authors":"A. Poushev, R. R. Mangushev, S. Yakimov","doi":"10.2118/206583-ms","DOIUrl":null,"url":null,"abstract":"\n Today, strategic planning of field development is based on full-field static and flow simulation models which are regularly updated as part of field surveillance programs and by integrating the actual results of drilling and testing of new production and exploration wells and integrated interpretation of seismic surveys and reservoir core and fluid laboratory analyses.\n One of the key factors for the success of investment projects is how quick and flexible the decision-making process is. Therefore, in modern conditions, prompt integration of new data into full-field flow simulation models followed by their processing, analysis, and decision-making on adjusting the strategic goals is of particular relevance for oil and gas production companies.\n For unique multi-reservoir fields containing dozens of reservoirs, hundreds of accumulations and wells, it is hardly possible to promptly update full-field static and flow simulation models within less than 6-12 months, therefore, the decisions are made in the absence of up-to-date models, which may lead to poor quality of production forecasts.\n The purpose of the study was to develop an approach to the modeling of unique fields, which would allow prompt integration of new data in a full-field flow simulation model while keeping the level of detail without significant time input.","PeriodicalId":11177,"journal":{"name":"Day 4 Fri, October 15, 2021","volume":"15 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Solving the Problem of Operational Accounting of Well Drilling Results in a Full-Scale Model of Unique Gas Condensate Fields\",\"authors\":\"A. Poushev, R. R. Mangushev, S. Yakimov\",\"doi\":\"10.2118/206583-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Today, strategic planning of field development is based on full-field static and flow simulation models which are regularly updated as part of field surveillance programs and by integrating the actual results of drilling and testing of new production and exploration wells and integrated interpretation of seismic surveys and reservoir core and fluid laboratory analyses.\\n One of the key factors for the success of investment projects is how quick and flexible the decision-making process is. Therefore, in modern conditions, prompt integration of new data into full-field flow simulation models followed by their processing, analysis, and decision-making on adjusting the strategic goals is of particular relevance for oil and gas production companies.\\n For unique multi-reservoir fields containing dozens of reservoirs, hundreds of accumulations and wells, it is hardly possible to promptly update full-field static and flow simulation models within less than 6-12 months, therefore, the decisions are made in the absence of up-to-date models, which may lead to poor quality of production forecasts.\\n The purpose of the study was to develop an approach to the modeling of unique fields, which would allow prompt integration of new data in a full-field flow simulation model while keeping the level of detail without significant time input.\",\"PeriodicalId\":11177,\"journal\":{\"name\":\"Day 4 Fri, October 15, 2021\",\"volume\":\"15 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Fri, October 15, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/206583-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Fri, October 15, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/206583-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

今天,油田开发的战略规划是基于整个油田的静态和流动模拟模型,这些模型作为现场监测计划的一部分定期更新,并通过整合新生产和探井的钻井和测试的实际结果,以及地震调查和储层岩心和流体实验室分析的综合解释。投资项目成功的关键因素之一是决策过程的快速和灵活。因此,在现代条件下,将新数据迅速整合到全油田流模拟模型中,然后对其进行处理、分析和决策,以调整战略目标,对油气生产公司来说尤为重要。对于包含数十个油藏、数百个油藏和井的特殊多油藏油田,很难在6-12个月内及时更新全油田静态和流动模拟模型,因此,在没有最新模型的情况下做出决策,这可能导致产量预测的质量较差。该研究的目的是开发一种独特油田的建模方法,该方法可以在不需要大量时间输入的情况下,在全油田流模拟模型中快速集成新数据,同时保持细节水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Solving the Problem of Operational Accounting of Well Drilling Results in a Full-Scale Model of Unique Gas Condensate Fields
Today, strategic planning of field development is based on full-field static and flow simulation models which are regularly updated as part of field surveillance programs and by integrating the actual results of drilling and testing of new production and exploration wells and integrated interpretation of seismic surveys and reservoir core and fluid laboratory analyses. One of the key factors for the success of investment projects is how quick and flexible the decision-making process is. Therefore, in modern conditions, prompt integration of new data into full-field flow simulation models followed by their processing, analysis, and decision-making on adjusting the strategic goals is of particular relevance for oil and gas production companies. For unique multi-reservoir fields containing dozens of reservoirs, hundreds of accumulations and wells, it is hardly possible to promptly update full-field static and flow simulation models within less than 6-12 months, therefore, the decisions are made in the absence of up-to-date models, which may lead to poor quality of production forecasts. The purpose of the study was to develop an approach to the modeling of unique fields, which would allow prompt integration of new data in a full-field flow simulation model while keeping the level of detail without significant time input.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信