利益相关者对公私伙伴关系早期终止的政治影响——基于中国收费公路项目的研究

IF 4.6 Q2 MATERIALS SCIENCE, BIOMATERIALS
Min Tang, Y. Wang, Yuan Yang
{"title":"利益相关者对公私伙伴关系早期终止的政治影响——基于中国收费公路项目的研究","authors":"Min Tang, Y. Wang, Yuan Yang","doi":"10.1080/15309576.2023.2204081","DOIUrl":null,"url":null,"abstract":"Abstract As a policy innovation for public goods delivery, public-private partnership (PPP) faces great risks in developing countries, and many projects have been terminated before the contract expiry date. This study explores how key stakeholders of the government that is responsible for PPP development, including the upper-tier government, the public, and business partner, can exert political influences through institutional ways over the fate of PPP projects. It argues that political pressures from the upper-tier government and the public, together with political relationship between the government and its business partner, determine whether the government would terminate its PPPs ahead of schedule. Empirically, this study investigates toll road PPP experiences in China. A qualitative comparative analysis (QCA) of 57 toll projects suggests the complexity of causal effect of political factors. In total, the factors of political pressures and political relationship form three pathways to PPP early termination.","PeriodicalId":2,"journal":{"name":"ACS Applied Bio Materials","volume":null,"pages":null},"PeriodicalIF":4.6000,"publicationDate":"2023-05-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Political Influences of Stakeholders on Early Termination of Public-Private Partnerships: A Study on China’s Toll Road Projects\",\"authors\":\"Min Tang, Y. Wang, Yuan Yang\",\"doi\":\"10.1080/15309576.2023.2204081\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract As a policy innovation for public goods delivery, public-private partnership (PPP) faces great risks in developing countries, and many projects have been terminated before the contract expiry date. This study explores how key stakeholders of the government that is responsible for PPP development, including the upper-tier government, the public, and business partner, can exert political influences through institutional ways over the fate of PPP projects. It argues that political pressures from the upper-tier government and the public, together with political relationship between the government and its business partner, determine whether the government would terminate its PPPs ahead of schedule. Empirically, this study investigates toll road PPP experiences in China. A qualitative comparative analysis (QCA) of 57 toll projects suggests the complexity of causal effect of political factors. In total, the factors of political pressures and political relationship form three pathways to PPP early termination.\",\"PeriodicalId\":2,\"journal\":{\"name\":\"ACS Applied Bio Materials\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":4.6000,\"publicationDate\":\"2023-05-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ACS Applied Bio Materials\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1080/15309576.2023.2204081\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"MATERIALS SCIENCE, BIOMATERIALS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS Applied Bio Materials","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/15309576.2023.2204081","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATERIALS SCIENCE, BIOMATERIALS","Score":null,"Total":0}
引用次数: 2

摘要

作为一种公共产品交付的政策创新,PPP在发展中国家面临着巨大的风险,许多项目在合同到期前就被终止了。本研究探讨了负责PPP发展的政府主要利益相关者,包括上层政府、公众和商业伙伴,如何通过制度方式对PPP项目的命运施加政治影响。它认为,来自上层政府和公众的政治压力,以及政府与商业伙伴之间的政治关系,决定了政府是否会提前终止ppp。在实证方面,本研究考察了中国收费公路PPP的经验。对57个收费项目的定性比较分析表明,政治因素的因果效应是复杂的。总的来说,政治压力和政治关系因素构成了PPP提前终止的三条路径。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Political Influences of Stakeholders on Early Termination of Public-Private Partnerships: A Study on China’s Toll Road Projects
Abstract As a policy innovation for public goods delivery, public-private partnership (PPP) faces great risks in developing countries, and many projects have been terminated before the contract expiry date. This study explores how key stakeholders of the government that is responsible for PPP development, including the upper-tier government, the public, and business partner, can exert political influences through institutional ways over the fate of PPP projects. It argues that political pressures from the upper-tier government and the public, together with political relationship between the government and its business partner, determine whether the government would terminate its PPPs ahead of schedule. Empirically, this study investigates toll road PPP experiences in China. A qualitative comparative analysis (QCA) of 57 toll projects suggests the complexity of causal effect of political factors. In total, the factors of political pressures and political relationship form three pathways to PPP early termination.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
ACS Applied Bio Materials
ACS Applied Bio Materials Chemistry-Chemistry (all)
CiteScore
9.40
自引率
2.10%
发文量
464
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信