Ming Lin, Xiaodong Liu, Haiqing Yin, Tian Yinghui, Jibin Gao, Wei-Tzuo Lin, Liu Mengyuan
{"title":"沉管隧道半刚性体系","authors":"Ming Lin, Xiaodong Liu, Haiqing Yin, Tian Yinghui, Jibin Gao, Wei-Tzuo Lin, Liu Mengyuan","doi":"10.1680/jstbu.21.00010","DOIUrl":null,"url":null,"abstract":"The Hong Kong–Zhuhai–Macao Bridge has a total length of 55 km. One of the greatest technical challenges is an immersed tunnel section stretching over 5.664 km and consisting of 33 prefabricated uni...","PeriodicalId":54570,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Structures and Buildings","volume":"518 1","pages":""},"PeriodicalIF":1.2000,"publicationDate":"2021-08-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Semi-rigid system for immersed tunnel\",\"authors\":\"Ming Lin, Xiaodong Liu, Haiqing Yin, Tian Yinghui, Jibin Gao, Wei-Tzuo Lin, Liu Mengyuan\",\"doi\":\"10.1680/jstbu.21.00010\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Hong Kong–Zhuhai–Macao Bridge has a total length of 55 km. One of the greatest technical challenges is an immersed tunnel section stretching over 5.664 km and consisting of 33 prefabricated uni...\",\"PeriodicalId\":54570,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Structures and Buildings\",\"volume\":\"518 1\",\"pages\":\"\"},\"PeriodicalIF\":1.2000,\"publicationDate\":\"2021-08-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Structures and Buildings\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1680/jstbu.21.00010\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Structures and Buildings","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1680/jstbu.21.00010","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
The Hong Kong–Zhuhai–Macao Bridge has a total length of 55 km. One of the greatest technical challenges is an immersed tunnel section stretching over 5.664 km and consisting of 33 prefabricated uni...
期刊介绍:
Structures and Buildings publishes peer-reviewed papers on the design and construction of civil engineering structures and the applied research associated with such activities. Topics include the design, strength, durability and behaviour of structural components and systems.
Topics covered: energy conservation, people movement within and around buildings, strength and durability of steel and concrete structural components, and the behaviour of building and bridge components and systems