{"title":"通过基于仿真的决策支持系统模块处理项目时间成本风险调控方面的冲突","authors":"Z. Laslo, Roni Laslo-Roth, G. Gurevich","doi":"10.1504/IJPOM.2019.10019954","DOIUrl":null,"url":null,"abstract":"Project management must consider tradeoffs of risks regarding performance, time, and cost. These tradeoffs may often cause conflicts between the project stakeholders. When decision outcomes are ambiguous and time is pressing, decision-makers may use controversial conflict resolution strategies that are often detrimental, changing conflicts that have constructive potential into those that are unhealthy. We propose a simulation-based DMSS module that can be used to quickly analyse the risks of alternative project plans. Its implementation can reduce the usage of controversial conflict resolution strategies and focus, instead, on one of the cooperation strategies that can enhance performance and well-being at work. Whereas meeting technical specifications is a non-negotiable demand, we can make do with a two-dimensional tradeoffs model - consider tradeoffs between time and cost risks. Thirteen of 17 implementations of the DMSS module hinted that this tool may be beneficial in preventing conflict escalations (a numerical example is given).","PeriodicalId":38056,"journal":{"name":"International Journal of Project Organisation and Management","volume":"3 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-03-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Handling conflicts over the regulation of project's time-cost risks via a simulation-based decision-making support system module\",\"authors\":\"Z. Laslo, Roni Laslo-Roth, G. Gurevich\",\"doi\":\"10.1504/IJPOM.2019.10019954\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Project management must consider tradeoffs of risks regarding performance, time, and cost. These tradeoffs may often cause conflicts between the project stakeholders. When decision outcomes are ambiguous and time is pressing, decision-makers may use controversial conflict resolution strategies that are often detrimental, changing conflicts that have constructive potential into those that are unhealthy. We propose a simulation-based DMSS module that can be used to quickly analyse the risks of alternative project plans. Its implementation can reduce the usage of controversial conflict resolution strategies and focus, instead, on one of the cooperation strategies that can enhance performance and well-being at work. Whereas meeting technical specifications is a non-negotiable demand, we can make do with a two-dimensional tradeoffs model - consider tradeoffs between time and cost risks. Thirteen of 17 implementations of the DMSS module hinted that this tool may be beneficial in preventing conflict escalations (a numerical example is given).\",\"PeriodicalId\":38056,\"journal\":{\"name\":\"International Journal of Project Organisation and Management\",\"volume\":\"3 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Project Organisation and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJPOM.2019.10019954\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Project Organisation and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJPOM.2019.10019954","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
Handling conflicts over the regulation of project's time-cost risks via a simulation-based decision-making support system module
Project management must consider tradeoffs of risks regarding performance, time, and cost. These tradeoffs may often cause conflicts between the project stakeholders. When decision outcomes are ambiguous and time is pressing, decision-makers may use controversial conflict resolution strategies that are often detrimental, changing conflicts that have constructive potential into those that are unhealthy. We propose a simulation-based DMSS module that can be used to quickly analyse the risks of alternative project plans. Its implementation can reduce the usage of controversial conflict resolution strategies and focus, instead, on one of the cooperation strategies that can enhance performance and well-being at work. Whereas meeting technical specifications is a non-negotiable demand, we can make do with a two-dimensional tradeoffs model - consider tradeoffs between time and cost risks. Thirteen of 17 implementations of the DMSS module hinted that this tool may be beneficial in preventing conflict escalations (a numerical example is given).
期刊介绍:
The aim of IJPOM is to attract contributions, and especially case studies, from a wide spectrum of academics and practitioners. As managers and business schools are increasingly placing increasing emphasis on strategy implementation issues, a project management approach will undoubtedly become more compelling and thus more acceptable in a wide range of fields. Readership IJPOM''s readership will come from professionals and managers dealing with project management on a daily basis. It also includes academics and researchers from various fields (business administration, economics and social sciences) concerned with the topic as well as policy makers and project planners in the field of business, commerce and industry. Contents IJPOM publishes original, theoretical, conceptual and empirical papers on a wide range of issues about project management. It also includes best practice examples as well as technical reports on the latest project management tools. Topics covered include Pre-project activities Project proposals/initial analysis, conception/design, management models Post-deployment review/documentation Engineering, production, service, construction projects Public sector programmes/campaigns, public/private sector partnerships Consultancy projects, public relations campaigns Mergers/acquisitions, outsourcing, alliances Particular events, humanitarian aid programmes, disasters projects Virtual projects, web-based PM, open-ended projects Communication/collaboration, negotiation skills, risk assessment/management Current/emerging standards, facilities/equipment support, quality assurance/testing Goals/objectives setting, budgeting, time/cost estimating HRM challenges, staffing, organisation change projects Opportunity management, marketing/branding strategies, measurement/metrics Project coordination/scheduling/governance, knowledge management.