{"title":"传输网短电缆护套粘接方法分析","authors":"Triin Kangro, J. Kilter","doi":"10.1109/EEEIC.2018.8493944","DOIUrl":null,"url":null,"abstract":"This paper presents the results of the study made in order to assess and clarify the selection principles of cable line sheath bonding method for short transmission network cable line. In this paper, two most commonly implemented approach, e.g. both ends bonded and cross-bonded, are discussed. Comparison between the bonding method is based on permitted sheath circulating current and induced voltage levels. Results from network load flow, fault and lightning analysis are presented. In addition, the effect of various number of cross-bonding points along the cable is shown. Results of this paper are important for transmission network planners.","PeriodicalId":6563,"journal":{"name":"2018 IEEE International Conference on Environment and Electrical Engineering and 2018 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe)","volume":"88 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Transmission Network Short Cable Line Sheath Bonding Methods\",\"authors\":\"Triin Kangro, J. Kilter\",\"doi\":\"10.1109/EEEIC.2018.8493944\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents the results of the study made in order to assess and clarify the selection principles of cable line sheath bonding method for short transmission network cable line. In this paper, two most commonly implemented approach, e.g. both ends bonded and cross-bonded, are discussed. Comparison between the bonding method is based on permitted sheath circulating current and induced voltage levels. Results from network load flow, fault and lightning analysis are presented. In addition, the effect of various number of cross-bonding points along the cable is shown. Results of this paper are important for transmission network planners.\",\"PeriodicalId\":6563,\"journal\":{\"name\":\"2018 IEEE International Conference on Environment and Electrical Engineering and 2018 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe)\",\"volume\":\"88 1\",\"pages\":\"1-6\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE International Conference on Environment and Electrical Engineering and 2018 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEEIC.2018.8493944\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE International Conference on Environment and Electrical Engineering and 2018 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEEIC.2018.8493944","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

为评价和阐明短传输网电缆线路护套粘接方法的选择原则,本文提出了研究结果。本文讨论了两种最常用的实现方法,即两端键合和交叉键合。结合方法之间的比较是基于允许的护套循环电流和感应电压水平。给出了网络潮流、故障和雷电分析的结果。此外,还显示了沿电缆不同数量的交键点的影响。本文的研究结果对输电网规划者具有重要的指导意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of Transmission Network Short Cable Line Sheath Bonding Methods
This paper presents the results of the study made in order to assess and clarify the selection principles of cable line sheath bonding method for short transmission network cable line. In this paper, two most commonly implemented approach, e.g. both ends bonded and cross-bonded, are discussed. Comparison between the bonding method is based on permitted sheath circulating current and induced voltage levels. Results from network load flow, fault and lightning analysis are presented. In addition, the effect of various number of cross-bonding points along the cable is shown. Results of this paper are important for transmission network planners.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信