{"title":"为参与工业化住宅建筑供应链的分包商开发持续改进的视角","authors":"Wolfgang Grenzfurtner, M. Gronalt","doi":"10.1108/scm-12-2019-0435","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThis paper aims to identify those factors, which will improve the collaboration between industrialised housebuilding (IHB) companies and their subcontractors within continuous improvement (CI) programmes. These factors will enhance the supply chain (SC) efficiency and productivity, eliminating obstacles when designing, implementing and managing CI programmes within IHB SC.\n\n\nDesign/methodology/approach\nAn explorative case study with a mixed-method approach was conducted within an IHB SC. To collect data, participant observation and guided interviews were applied. A stakeholder analysis was conducted to structure their guiding principles. A causal loop diagram (CLD) analysis was used to model the effects on and relationships within a SC and their impact on the involvement of subcontractors.\n\n\nFindings\nThe influences on the stakeholders and the guidelines under which they work are defined. Potential conflicts of interest between stakeholders are identified. A CLD is used to model a better understanding of system behaviour impacting on the relationships within the SC and on subcontractor involvement. The results provide a number of factors that need to be considered when designing, implementing and managing a CI programme.\n\n\nResearch limitations/implications\nThe research suggests better ways to use subcontractors’ specific knowledge of on-site processes such that productivity and efficiency are enhanced. Improvements within the construction supply chain (CSC) will, in the future, not be limited to small improvement gains at company level.\n\n\nOriginality/value\nThis paper extends the body of knowledge in CSC management by revealing factors important for designing, implementing and managing CI programmes, which enables the successful involvement of subcontractors in CI on SC level.\n","PeriodicalId":30468,"journal":{"name":"Supply Chain Management Journal","volume":"36 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-11-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Developing a continuous improvement perspective for subcontractor involvement in the industrialised housebuilding supply chain\",\"authors\":\"Wolfgang Grenzfurtner, M. Gronalt\",\"doi\":\"10.1108/scm-12-2019-0435\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nThis paper aims to identify those factors, which will improve the collaboration between industrialised housebuilding (IHB) companies and their subcontractors within continuous improvement (CI) programmes. These factors will enhance the supply chain (SC) efficiency and productivity, eliminating obstacles when designing, implementing and managing CI programmes within IHB SC.\\n\\n\\nDesign/methodology/approach\\nAn explorative case study with a mixed-method approach was conducted within an IHB SC. To collect data, participant observation and guided interviews were applied. A stakeholder analysis was conducted to structure their guiding principles. A causal loop diagram (CLD) analysis was used to model the effects on and relationships within a SC and their impact on the involvement of subcontractors.\\n\\n\\nFindings\\nThe influences on the stakeholders and the guidelines under which they work are defined. Potential conflicts of interest between stakeholders are identified. A CLD is used to model a better understanding of system behaviour impacting on the relationships within the SC and on subcontractor involvement. The results provide a number of factors that need to be considered when designing, implementing and managing a CI programme.\\n\\n\\nResearch limitations/implications\\nThe research suggests better ways to use subcontractors’ specific knowledge of on-site processes such that productivity and efficiency are enhanced. Improvements within the construction supply chain (CSC) will, in the future, not be limited to small improvement gains at company level.\\n\\n\\nOriginality/value\\nThis paper extends the body of knowledge in CSC management by revealing factors important for designing, implementing and managing CI programmes, which enables the successful involvement of subcontractors in CI on SC level.\\n\",\"PeriodicalId\":30468,\"journal\":{\"name\":\"Supply Chain Management Journal\",\"volume\":\"36 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-11-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Supply Chain Management Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/scm-12-2019-0435\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Supply Chain Management Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/scm-12-2019-0435","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Developing a continuous improvement perspective for subcontractor involvement in the industrialised housebuilding supply chain
Purpose
This paper aims to identify those factors, which will improve the collaboration between industrialised housebuilding (IHB) companies and their subcontractors within continuous improvement (CI) programmes. These factors will enhance the supply chain (SC) efficiency and productivity, eliminating obstacles when designing, implementing and managing CI programmes within IHB SC.
Design/methodology/approach
An explorative case study with a mixed-method approach was conducted within an IHB SC. To collect data, participant observation and guided interviews were applied. A stakeholder analysis was conducted to structure their guiding principles. A causal loop diagram (CLD) analysis was used to model the effects on and relationships within a SC and their impact on the involvement of subcontractors.
Findings
The influences on the stakeholders and the guidelines under which they work are defined. Potential conflicts of interest between stakeholders are identified. A CLD is used to model a better understanding of system behaviour impacting on the relationships within the SC and on subcontractor involvement. The results provide a number of factors that need to be considered when designing, implementing and managing a CI programme.
Research limitations/implications
The research suggests better ways to use subcontractors’ specific knowledge of on-site processes such that productivity and efficiency are enhanced. Improvements within the construction supply chain (CSC) will, in the future, not be limited to small improvement gains at company level.
Originality/value
This paper extends the body of knowledge in CSC management by revealing factors important for designing, implementing and managing CI programmes, which enables the successful involvement of subcontractors in CI on SC level.