运用六西格玛降低建筑施工成本超支和工期延误的研究

nbspsheik farid.a
{"title":"运用六西格玛降低建筑施工成本超支和工期延误的研究","authors":"nbspsheik farid.a","doi":"10.1729/JOURNAL.27602","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":14009,"journal":{"name":"International Journal of Mechanical and Production Engineering Research and Development","volume":"116 1","pages":"38-45"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"study on reduction of cost overrun and time delay in building construction using six sigma\",\"authors\":\"nbspsheik farid.a\",\"doi\":\"10.1729/JOURNAL.27602\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":14009,\"journal\":{\"name\":\"International Journal of Mechanical and Production Engineering Research and Development\",\"volume\":\"116 1\",\"pages\":\"38-45\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Mechanical and Production Engineering Research and Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1729/JOURNAL.27602\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mechanical and Production Engineering Research and Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1729/JOURNAL.27602","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文章由计算机程序翻译,如有差异,请以英文原文为准。
study on reduction of cost overrun and time delay in building construction using six sigma
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信