{"title":"运用六西格玛降低建筑施工成本超支和工期延误的研究","authors":"nbspsheik farid.a","doi":"10.1729/JOURNAL.27602","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":14009,"journal":{"name":"International Journal of Mechanical and Production Engineering Research and Development","volume":"116 1","pages":"38-45"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"study on reduction of cost overrun and time delay in building construction using six sigma\",\"authors\":\"nbspsheik farid.a\",\"doi\":\"10.1729/JOURNAL.27602\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":14009,\"journal\":{\"name\":\"International Journal of Mechanical and Production Engineering Research and Development\",\"volume\":\"116 1\",\"pages\":\"38-45\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Mechanical and Production Engineering Research and Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1729/JOURNAL.27602\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mechanical and Production Engineering Research and Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1729/JOURNAL.27602","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}