{"title":"浸渍桥梁边梁全寿命周期成本分析","authors":"O. During, K. Malaga","doi":"10.1515/rbm14.20.6-0043","DOIUrl":null,"url":null,"abstract":"Abstract The aim of this study is to perform a life cycle cost analysis (LCC), where the economic cost of extending service life by the impregnation of bridge edge beams is compared to the reparation of an edge beam. Previous economic analyses on bridge edge beams had shown that there was no clear economic benefit in impregnating the edge beams. However, results from this study pointed out that in most cases there is a clear economic benefit to impregnate the bridge edge beams even if it has to be repeated every 15 years.","PeriodicalId":20957,"journal":{"name":"Restoration of Buildings and Monuments","volume":"30 1","pages":"441 - 446"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Life Cycle Cost Analysis on Impregnated Bridge Edge Beams\",\"authors\":\"O. During, K. Malaga\",\"doi\":\"10.1515/rbm14.20.6-0043\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The aim of this study is to perform a life cycle cost analysis (LCC), where the economic cost of extending service life by the impregnation of bridge edge beams is compared to the reparation of an edge beam. Previous economic analyses on bridge edge beams had shown that there was no clear economic benefit in impregnating the edge beams. However, results from this study pointed out that in most cases there is a clear economic benefit to impregnate the bridge edge beams even if it has to be repeated every 15 years.\",\"PeriodicalId\":20957,\"journal\":{\"name\":\"Restoration of Buildings and Monuments\",\"volume\":\"30 1\",\"pages\":\"441 - 446\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Restoration of Buildings and Monuments\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/rbm14.20.6-0043\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Restoration of Buildings and Monuments","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/rbm14.20.6-0043","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Life Cycle Cost Analysis on Impregnated Bridge Edge Beams
Abstract The aim of this study is to perform a life cycle cost analysis (LCC), where the economic cost of extending service life by the impregnation of bridge edge beams is compared to the reparation of an edge beam. Previous economic analyses on bridge edge beams had shown that there was no clear economic benefit in impregnating the edge beams. However, results from this study pointed out that in most cases there is a clear economic benefit to impregnate the bridge edge beams even if it has to be repeated every 15 years.