{"title":"解决凝析气项目开发不同阶段问题的变细节综合模型层次","authors":"A. Varavva, R. Apasov, R. Badgutdinov, A. Yamaletdinov, F. A. Koryakin, Ekaterina Evgenevna Sandalova, D. Samolovov, S. Bikbulatov, Sergey Sergey Nekhaev","doi":"10.2118/206545-ms","DOIUrl":null,"url":null,"abstract":"\n This study makes an attempt to generalize the integrated modeling tools used by the authors in practice on the basis of the following criteria: the volume of the initial data, the integration mechanism, constraints and assumptions. Various types of integrated models are compared with each other, the need for their application is analyzed, they are connected at various stages of the project development and by the tasks solved at this stage. It also describes the challenges that the authors encountered when working with integrated models of various levels of detail, approaches to their solution, and the lessons learned.","PeriodicalId":10970,"journal":{"name":"Day 1 Tue, October 12, 2021","volume":"31 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Hierarchy of Integrated Models of Varying Detail to Solve Problems at Different Stages of Gas Condensate Projects Development\",\"authors\":\"A. Varavva, R. Apasov, R. Badgutdinov, A. Yamaletdinov, F. A. Koryakin, Ekaterina Evgenevna Sandalova, D. Samolovov, S. Bikbulatov, Sergey Sergey Nekhaev\",\"doi\":\"10.2118/206545-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This study makes an attempt to generalize the integrated modeling tools used by the authors in practice on the basis of the following criteria: the volume of the initial data, the integration mechanism, constraints and assumptions. Various types of integrated models are compared with each other, the need for their application is analyzed, they are connected at various stages of the project development and by the tasks solved at this stage. It also describes the challenges that the authors encountered when working with integrated models of various levels of detail, approaches to their solution, and the lessons learned.\",\"PeriodicalId\":10970,\"journal\":{\"name\":\"Day 1 Tue, October 12, 2021\",\"volume\":\"31 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Tue, October 12, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/206545-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, October 12, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/206545-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文从初始数据量、集成机制、约束条件和假设条件四个方面对作者在实践中使用的集成建模工具进行了归纳。对各种类型的集成模型进行了比较,分析了它们的应用需求,并在项目开发的各个阶段以及该阶段所解决的任务中将它们联系起来。它还描述了作者在使用各种细节级别的集成模型时遇到的挑战、解决方案的方法以及学到的经验教训。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Hierarchy of Integrated Models of Varying Detail to Solve Problems at Different Stages of Gas Condensate Projects Development
This study makes an attempt to generalize the integrated modeling tools used by the authors in practice on the basis of the following criteria: the volume of the initial data, the integration mechanism, constraints and assumptions. Various types of integrated models are compared with each other, the need for their application is analyzed, they are connected at various stages of the project development and by the tasks solved at this stage. It also describes the challenges that the authors encountered when working with integrated models of various levels of detail, approaches to their solution, and the lessons learned.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信