透镜状地层开发中实现最大净现值的最佳井数计算方法

Vadim Andreevich Rubailo, K. Isakov, A. Osipenko, M. M. Akhmadiev
{"title":"透镜状地层开发中实现最大净现值的最佳井数计算方法","authors":"Vadim Andreevich Rubailo, K. Isakov, A. Osipenko, M. M. Akhmadiev","doi":"10.2118/206500-ms","DOIUrl":null,"url":null,"abstract":"\n The work is devoted to the analytical methodology for the development of oil lenticular formations. The method is based on the theory of potentials for vertical and horizontal wells. The work takes into account the interference of wells, geological and petrophysical parameters of lenses, as well as the properties of the reservoir fluid, and a new equation for estimating the inflow to a horizontal well is derived. An assessment of the correctness of this work on the company's assets was made. The dependence for the express estimation of the number of wells depending on the economic parameters at the early stages of project development is obtained.","PeriodicalId":11052,"journal":{"name":"Day 3 Thu, October 14, 2021","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Formation of a Methodology for Calculating the Optimal Number of Wells in the Development of Lenticular Formations to Achieve Maximum NPV\",\"authors\":\"Vadim Andreevich Rubailo, K. Isakov, A. Osipenko, M. M. Akhmadiev\",\"doi\":\"10.2118/206500-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The work is devoted to the analytical methodology for the development of oil lenticular formations. The method is based on the theory of potentials for vertical and horizontal wells. The work takes into account the interference of wells, geological and petrophysical parameters of lenses, as well as the properties of the reservoir fluid, and a new equation for estimating the inflow to a horizontal well is derived. An assessment of the correctness of this work on the company's assets was made. The dependence for the express estimation of the number of wells depending on the economic parameters at the early stages of project development is obtained.\",\"PeriodicalId\":11052,\"journal\":{\"name\":\"Day 3 Thu, October 14, 2021\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, October 14, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/206500-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, October 14, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/206500-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

这项工作致力于油透镜状地层开发的分析方法。该方法基于直井和水平井电位理论。在综合考虑井间干扰、透镜体地质和岩石物理参数以及储层流体性质的基础上,导出了估算水平井流入的新方程。对这项工作对公司资产的正确性进行了评估。得到了项目开发初期经济参数对井数的表达式估计的依赖关系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Formation of a Methodology for Calculating the Optimal Number of Wells in the Development of Lenticular Formations to Achieve Maximum NPV
The work is devoted to the analytical methodology for the development of oil lenticular formations. The method is based on the theory of potentials for vertical and horizontal wells. The work takes into account the interference of wells, geological and petrophysical parameters of lenses, as well as the properties of the reservoir fluid, and a new equation for estimating the inflow to a horizontal well is derived. An assessment of the correctness of this work on the company's assets was made. The dependence for the express estimation of the number of wells depending on the economic parameters at the early stages of project development is obtained.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信