基于模糊topsis的建设项目评标模型设计

Wei-zhuo Sun, Bing-sheng Liu, Li Lin
{"title":"基于模糊topsis的建设项目评标模型设计","authors":"Wei-zhuo Sun, Bing-sheng Liu, Li Lin","doi":"10.1109/ICEEE.2010.5660482","DOIUrl":null,"url":null,"abstract":"This paper analyzed the principles of TOPSIS, used the fuzzy set to pretreat the uncertainty factors in evaluation work. Then obtain the relative closeness according to the distance between each schemes and positive ideal solutions as well as negative ideal solutions. After that, we made comprehensive evaluation. At the end of this paper, a practical example is given to illustrate the effectiveness and feasibility of the proposed model.","PeriodicalId":6302,"journal":{"name":"2010 International Conference on E-Product E-Service and E-Entertainment","volume":"116 1","pages":"1-4"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Bid Evaluation Model Design for Construction Project Based on Fuzzy-TOPSIS\",\"authors\":\"Wei-zhuo Sun, Bing-sheng Liu, Li Lin\",\"doi\":\"10.1109/ICEEE.2010.5660482\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper analyzed the principles of TOPSIS, used the fuzzy set to pretreat the uncertainty factors in evaluation work. Then obtain the relative closeness according to the distance between each schemes and positive ideal solutions as well as negative ideal solutions. After that, we made comprehensive evaluation. At the end of this paper, a practical example is given to illustrate the effectiveness and feasibility of the proposed model.\",\"PeriodicalId\":6302,\"journal\":{\"name\":\"2010 International Conference on E-Product E-Service and E-Entertainment\",\"volume\":\"116 1\",\"pages\":\"1-4\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on E-Product E-Service and E-Entertainment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEEE.2010.5660482\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on E-Product E-Service and E-Entertainment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEEE.2010.5660482","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文分析了TOPSIS的原理,利用模糊集对评价工作中的不确定因素进行预处理。然后根据各方案与正理想解和负理想解之间的距离获得相对接近度。之后,我们进行了综合评价。最后,通过一个实例说明了所提模型的有效性和可行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Bid Evaluation Model Design for Construction Project Based on Fuzzy-TOPSIS
This paper analyzed the principles of TOPSIS, used the fuzzy set to pretreat the uncertainty factors in evaluation work. Then obtain the relative closeness according to the distance between each schemes and positive ideal solutions as well as negative ideal solutions. After that, we made comprehensive evaluation. At the end of this paper, a practical example is given to illustrate the effectiveness and feasibility of the proposed model.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信